ISO 50001:2018 Internal Auditor Training

Online training to audit whether your energy performance really improves, with evidence from meters, data and the people who run your SEUs.

The training is a practitioner course for internal auditors of energy management systems: what ISO 50001:2018 requires, clause by clause, and how to plan, conduct, report and follow up an internal audit using ISO 19011:2026 guidance. It covers auditing the energy review, significant energy uses, energy performance indicators, baselines and normalization, the energy data collection plan, operational control, design and procurement. A pharmaceutical manufacturing site in Toronto runs through the course.

Secure payment by Stripe · for yourself or for your team

What you get

  • 26 video modules

    About 6 hours, with captions. Watch at your own pace on any device.

  • Practice after every module

    Short questions check your understanding before you move on.

  • Final exam

    Score at least 60% to receive the Certificate of Competence.

  • Built by experts

    Industry experts, domain specialist trainers and globally renowned auditors with 30+ years in ISO and GRC.

A certificate you can prove, and share

Verifiable certificate with a QR code anyone can scan, plus a digital badge to add to your LinkedIn profile.

See how verification works →

Standard and editionISO 50001:2018

Last updated5 November 2026

Preview this course

Experience the learning
before you enrol.

Watch a sample from ISO 50001:2018 Internal Auditor Training before you enrol.

ISO 50001:2018 Internal Auditor TrainingSample

Learning outcomes

Knowledge you can put to work.

Connect the subject to the responsibilities and decisions people encounter in their roles.

  • Explain what ISO 50001:2018 clause 9.2 requires of internal audits, including energy performance improvement
  • Audit the energy review, significant energy uses and their relevant variables
  • Audit EnPIs, energy baselines, normalization and the energy data collection plan
  • Audit operational control, design and procurement for significant energy uses
  • Trace one significant energy use through every clause, from data to management review
  • Write clear nonconformities, report results and follow up corrective action

Part of: Environmental and Energy Management Training

Inside the course

A clear path through the essentials.

26 modules, 26 practice checkpoints and a final exam. Video runtimes are approximate; allow additional time for the practice questions and the final exam. Modules marked optional can be skipped; the others are studied in any order.

Part 1Foundations of energy management system auditingApprox. 58 min

  1. Welcome: why EnMS internal audit matters14 min

    Why EnMS internal audit matters, through BASF's 2023 cuts, Winter Storm Uri, the EU Energy Efficiency Directive and the IEA's 2024 energy intensity figures.

    What this module covers

    Opens by asking whether a ten percent lower energy bill proves better energy performance. Walks through four real events: European gas prices above 340 euros per megawatt hour in August 2022 and BASF's February 2023 job cuts and ammonia plant closure at Ludwigshafen; Winter Storm Uri in Texas in February 2021; the revised EU Energy Efficiency Directive of September 2023 and its Article 11 thresholds; and the IEA's report of about 1 percent improvement in global energy intensity. Turns each into an auditor's question on context, the energy review, legal requirements and improvement against a baseline. Introduces Alder Pharma, a worked example of a generic medicines manufacturer in Toronto, and its three significant energy uses. Contrasts two audits of a chiller EnPI, one of which finds that the baseline was never normalized for weather. Explains ISO 50001:2018, clause 9.2, the course structure and four common myths.

    What you will be able to do

    • Explain why clause 9.2 internal audits must test energy performance as well as process
    • Identify auditor questions on context, energy review, legal requirements and improvement
    • Recognise four common myths about energy performance and energy audits

    Why it matters

    Shows energy managers and auditors why an internal audit is worth what it finds, and how weak evidence can hide a lack of real improvement.

    Practice: Practice: Welcome: why EnMS internal audit matters · 3 questions

  2. The standard through an auditor's eyes14 min

    Reads ISO 50001:2018 as an auditor: changes from 2011, the ten-clause structure, Plan-Do-Check-Act, Annex A, key verbs and the 2024 climate amendment.

    What this module covers

    Starts by asking whether two factories, one using twice the energy per unit of the other, can both conform, and shows from clauses 0.4 and 1 that they can. Lists the main changes from the 2011 edition, including normalization and the move from the energy measurement plan to the energy data collection plan. Explains the ten-clause structure shared with ISO 9001, ISO 14001 and ISO 45001, the Plan-Do-Check-Act cycle in energy terms, and the data-driven energy performance approach. Sets out the scope limits, the guidance standards ISO 50006, ISO 50015 and ISO 19011:2026, and why Annex A adds no requirements. Explains the verbs applicable, appropriate, consider, take into account, ensure, retain and maintain. Covers the 2024 climate amendment to clauses 4.1 and 4.2, the three routes to show conformity, and a Frankfurt data centre's integrated audit programme. Ends with a Singapore hotel group exercise.

    What you will be able to do

    • Describe the structure of ISO 50001:2018 and how it follows Plan-Do-Check-Act
    • Distinguish the requirements in clauses 4 to 10 from the guidance in Annex A
    • Apply the meaning of consider and take into account when judging evidence

    Why it matters

    Stops auditors raising findings against guidance or against energy levels, so every nonconformity rests on a real requirement of the standard.

    Practice: Practice: The standard through an auditor's eyes · 3 questions

  3. The language of energy performance15 min

    The ISO 50001 terms every auditor uses, from energy use and SEUs to EnPIs, energy baselines, relevant variables, static factors and normalization.

    What this module covers

    Opens by asking whether doubling output with half as much extra energy is better performance. Defines energy, energy use and energy consumption, energy efficiency and energy performance, and energy performance improvement measured against the energy baseline. Explains the energy review and significant energy uses, applying Alder Pharma's ten percent criterion to its cleanroom HVAC, chilled water and compressed air. Defines the EnPI and its four types, measured value, ratio, model and other relationship, then the EnPI value, read as 0.78 kilowatt hours per ton-hour of cooling. Sets out five marks of a sound baseline as an audit checklist. Distinguishes static factors from relevant variables, then works through normalization with Alder Pharma's regression model: 480 megawatt hours expected and 456 metered. Covers objectives, energy targets, the energy management team and audit, a London hospital example, four common confusions and two classification exercises.

    What you will be able to do

    • Distinguish energy use, energy consumption, energy efficiency and energy performance
    • Explain how EnPIs, EnPI values and energy baselines work together to show improvement
    • Apply normalization for relevant variables to compare energy performance fairly

    Why it matters

    Gives auditors exact energy performance vocabulary, so their findings on SEUs, indicators and baselines cannot be dismissed on a technicality.

    Practice: Practice: The language of energy performance · 3 questions

  4. Clause 9.2 and the principles of auditing15 min

    What clause 9.2 requires of EnMS internal audits, the ISO 19011:2026 audit terms and roles, and the seven principles of auditing.

    What this module covers

    Begins with an Alder Pharma utilities engineer who audited his own compressed air system, found nothing, and missed a year-old leak survey and a third more night-time load. Explains clause 9.2.1 and its three questions: does the system improve energy performance, does it conform, and is it effectively implemented and maintained. Groups the six audit programme duties in clause 9.2.2. Separates an energy audit from an internal audit, then introduces ISO 19011:2026, the fourth edition, and its remote auditing guidance. Defines audit and objective evidence from interviews, records and observation, applied to a quarterly leak survey. Links criteria, evidence, finding and conclusion as one chain, and contrasts an impression with a verifiable finding. Covers audit client, auditee, auditor and technical expert, first, second and third-party, combined, joint and remote audits. Sets out the seven principles, cross-auditing for independence, a Chicago hotel with one auditor, and two exercises.

    What you will be able to do

    • Explain the three questions clause 9.2 asks an EnMS internal audit to answer
    • Distinguish an energy audit from an internal audit of the energy management system
    • Apply the chain of criteria, evidence, finding and conclusion to write verifiable findings

    Why it matters

    Helps organisations run independent internal audits that management can trust, and avoids the blind spots that come from auditing your own work.

    Practice: Practice: Clause 9.2 and the principles of auditing · 3 questions

Part 2Auditing context, leadership, policy and planningApprox. 70 min

  1. Context, parties and legal requirements14 min

    Auditing clauses 4.1 and 4.2: energy issues, the 2024 climate change question, interested parties and their requirements, and the legal register.

    What this module covers

    Starts with an Alder Pharma issues list that omits energy prices, gas supply and hotter summers. Explains clause 4.1 and the 2024 climate change question, noting the standard does not require the issues to be documented. Uses the Annex A examples as prompts, with the BASF gas price case and Winter Storm Uri as lessons on cost and supply. Sets out clause 4.2: the relevant interested parties, their requirements, and which ones the system addresses, with Alder Pharma's regulators, a net-zero customer, peak demand limits and boiler noise. Shows where other requirements hide, from supply contracts to voluntary pledges. Covers the four duties on legal and other requirements, the EU Energy Efficiency Directive thresholds, and a Paris retail chain's legal register. Traces context into clauses 6.1, 6.2, 6.3 and 9.1.2, then writes two findings and closes with a Mumbai factory exercise on grid outages.

    What you will be able to do

    • Assess whether the issues determined under clause 4.1 include energy cost, supply and weather
    • Check that clause 4.2 decisions on interested parties' requirements are made and make sense
    • Audit a legal register for access, application, consideration and review at intervals

    Why it matters

    Prepares auditors to test whether energy price, supply and legal risks shape the EnMS, and to avoid demanding documents the standard does not require.

    Practice: Practice: Context, parties and legal requirements · 3 questions

  2. Scope, boundaries and the EnMS14 min

    Auditing clauses 4.3 and 4.4: EnMS scope and boundaries, authority to control energy, the rule that no energy type is excluded, and system processes.

    What this module covers

    Opens with Alder Pharma's whole-site scope that covers electricity only, leaving out the gas boilers. Defines boundary and EnMS scope, then sets out the four requirements of clause 4.3, including the absolute rule that no energy type within the scope and boundaries is excluded. Lists the site's energy types, from electricity and gas to diesel and rooftop solar, and shows how one exclusion spreads into the energy review, indicators and operating criteria. Explains the authority test with a leased sales office and an insurer in Tokyo whose scope includes a data centre, leased floors and its car fleet. Clarifies how renewable energy is treated. Tests the scope against context and interested parties, then explains clause 4.4 and its link to improving energy performance. Gives the auditor's questions and the bill check, writes findings on the excluded gas and on authority, and closes with a Sydney brewery exercise.

    What you will be able to do

    • Check that no energy type within the scope and boundaries has been excluded
    • Assess whether the organisation has authority to control energy inside its boundary
    • Compare energy bills and meters with the documented scope to find gaps

    Why it matters

    Stops scope errors that hide whole energy types from the EnMS, so the energy review, indicators and controls cover everything the site uses.

    Practice: Practice: Scope, boundaries and the EnMS · 3 questions

  3. Leadership and commitment14 min

    Auditing clause 5.1 leadership and commitment: the thirteen ways top management shows it, including action plans, the energy team, EnPIs and change.

    What this module covers

    Opens with an Alder Pharma chiller resequencing plan approved in May, whose budget was cut in September without telling the energy team, while the target is still reported as on track. Walks through the thirteen items of clause 5.1, highlighting those specific to ISO 50001: approving and implementing action plans, forming the energy management team, ensuring EnPIs represent energy performance, and addressing changes. Explains resources from Annex A, why responsibility can be delegated but not accountability, and who top management is for a site scope. Gives four examples of demonstrated leadership, a Hong Kong hotel group's board scorecard and bonuses, and how to test clause 5.1 items through other clauses. Gives tips for interviewing top management about decisions. Writes findings on the unfunded action plan and an unnormalized total megawatt hour indicator, lists three common auditor mistakes, and ends with a New York office tower exercise.

    What you will be able to do

    • Identify the four leadership items in clause 5.1 that are specific to ISO 50001
    • Interview top management about decisions and match their answers to records
    • Write a finding when an approved action plan loses its budget and is not implemented

    Why it matters

    Helps auditors go to the top and test real commitment, so energy projects keep their budgets and indicators show true energy performance.

    Practice: Practice: Leadership and commitment · 3 questions

  4. Energy policy and the energy team14 min

    Auditing clause 5.2 energy policy and clause 5.3 energy management team: seven policy contents, efficient purchasing and design, authority and reporting.

    What this module covers

    Starts with Alder Pharma's framed policy promising energy-efficient purchasing, and a replacement chiller bought on price alone by a procurement team that had never seen it. Lists the seven policy contents in clause 5.2, highlighting resources, efficient procurement and design as the ISO 50001 differences, and the four duties for the policy itself. Explains why a brief policy is fine, how to follow each commitment into practice, and how to test communication by asking operators what it means for their job. Uses a Boston university as a second example. Defines the energy management team, notes one person can perform the role, and sets out its five responsibilities in clause 5.3. Tests authority by asking what the team can change on its own, and checks quarterly reporting. Writes findings on the chiller tender and missed reports, and ends with a Dubai shopping mall exercise.

    What you will be able to do

    • Check an energy policy for its seven required contents and periodic review
    • Follow policy commitments into tenders, design briefs and operator practice
    • Assess whether the energy management team has the authority to act and reports on time

    Why it matters

    Shows auditors where an energy policy lives or dies, in tenders and design briefs, and whether the energy team can deliver what it is responsible for.

    Practice: Practice: Energy policy and the energy team · 3 questions

  5. Risks, targets and action plans14 min

    Auditing clauses 6.1 and 6.2: risks and opportunities from context, objectives and energy targets aimed at SEUs, and action plans with verification methods.

    What this module covers

    Opens with an Alder Pharma LED lighting action plan marked complete, whose forty percent saving came from a supplier brochure on an unmetered circuit. Explains clause 6.1 and the chain from context issue to risk or opportunity, action and evaluation, with Alder Pharma's condensate return, weather model, net-zero customer and a second trained engineer. Sets out clause 6.2: objectives and energy targets are both required, with eight conditions, and why targets should aim at the significant energy uses and opportunities. Lists the five contents of an action plan in clause 6.2.3, centred on the method to verify energy performance improvement, and shows a sound method with temporary loggers that measured a thirty-four percent saving. Covers measuring targets against the normalized baseline, integration into business plans, a Singapore hospital's chiller plan and the link to clause 9.1. Writes two findings and ends with a Chicago bakery exercise.

    What you will be able to do

    • Trace context issues through risks, opportunities and actions to an evaluation of effectiveness
    • Check that energy targets address the significant energy uses and known opportunities
    • Assess whether each action plan states a method to verify energy performance improvement

    Why it matters

    Helps auditors separate completed work from proven improvement, so savings claimed in action plans rest on measurement rather than a brochure.

    Practice: Practice: Risks, targets and action plans · 3 questions

Part 3Auditing the energy review, EnPIs, baselines and dataApprox. 70 min

  1. The energy review part 1: SEUs14 min

    Auditing the first half of the clause 6.3 energy review: energy types, past and current use from measured data, and identifying significant energy uses.

    What this module covers

    Begins with an Alder Pharma energy review whose ten percent criterion left compressed air, at fourteen percent, off the SEU list, so the compressors had no indicator, target or operating criteria. Explains the energy review as the analytical engine of the EnMS and the requirements of clause 6.3 a) and b), including the methodology and criteria to be maintained and the results retained. Maps the review's inputs and outputs and checks energy types against the scope. Grades data confidence from sub-meters to estimates, and explains how a formal energy audit can feed the review. Sets out a five-step method for determining SEUs and common criteria, then ranks Alder Pharma's energy balance as a Pareto: cleanroom HVAC 12,240, chilled water 10,080 and compressed air 5,040 megawatt hours. Covers a Frankfurt data centre that counts potential as well as consumption, two findings, and a Mumbai textile mill exercise.

    What you will be able to do

    • Apply the organisation's own significance criterion to its data to test the SEU list
    • Assess the confidence of energy balance figures from meters, calculations and estimates
    • Check that the energy review methodology is maintained and its results retained

    Why it matters

    Gives auditors the single most useful energy review test, so missed significant energy uses are found before indicators and targets are built on them.

    Practice: Practice: The energy review part 1: SEUs · 3 questions

  2. The energy review part 2: SEU details14 min

    Completing the clause 6.3 energy review audit: variables, current performance and people for each SEU, prioritised opportunities, forecasts and updates.

    What this module covers

    Opens with a new tablet line installed at Alder Pharma in March, missing from an energy review last updated a year ago, while compressed air demand rose by a fifth. Explains clause 6.3 c): for each SEU, the relevant variables, current energy performance and the people who influence it. Lists Alder Pharma's variables, from outdoor air enthalpy for cleanroom HVAC to lines running for compressed air, and shows that normalizing for production revealed no loss of efficiency. Builds the compressed air people list, including the service contractor, and links it to clause 7. Sets out the prioritised opportunities list, from leak repairs worth 600 megawatt hours to condensate return, supply security as guidance, the 38,500 megawatt hour forecast and update triggers. Uses a Los Angeles film studio as a second example, writes findings on the missed update and the contractor, and ends with a Paris hotel exercise.

    What you will be able to do

    • Check that each SEU has relevant variables, a current performance figure and a people list
    • Assess whether improvement opportunities are prioritised and turned into action plans
    • Identify major changes that should have triggered an update of the energy review

    Why it matters

    Helps auditors tell whether an SEU has become less efficient or simply busier, and makes sure contractors who touch the controls are not overlooked.

    Practice: Practice: The energy review part 2: SEU details · 3 questions

  3. Energy performance indicators14 min

    Auditing clause 6.4 EnPIs: choosing indicators that can show improvement, the documented method, relevant variables and baseline comparison.

    What this module covers

    Starts with Alder Pharma's single indicator, total megawatt hours a month, which hid about 600 megawatt hours of compressed air leak savings because output rose. Explains the clause 6.4 requirements: indicators appropriate for measuring energy performance that enable improvement to be demonstrated, a maintained method, consideration of relevant variable data, and values compared with baselines and retained. Asks what action would make an indicator move. Matches an EnPI to each Alder Pharma SEU and gives four marks of good and poor indicators. Walks through measure, normalize, compare and retain for the chiller value of 0.78 kilowatt hours per ton-hour, and updating an indicator when a new chiller is added. Covers indicators outside SEUs, a New York office tower that models occupancy, and top management's role. Writes two findings, builds a boiler indicator, and ends with a Tokyo car-parts plant exercise.

    What you will be able to do

    • Test whether an EnPI can move when the team takes action to improve performance
    • Check that indicator values are normalized where needed and compared with their baselines
    • Assess whether the documented method leads to EnPI updates when an SEU changes

    Why it matters

    Ensures real savings show up in the numbers, so teams get credit for improvement and management sees true energy performance rather than output effects.

    Practice: Practice: Energy performance indicators · 3 questions

  4. Energy baselines and normalization14 min

    Auditing clause 6.5 energy baselines: suitable periods, when normalization is required, checking a regression model, and the three triggers for revision.

    What this module covers

    Opens with a sister site that reset its compressed air baseline three times in eighteen months, each time to a high-consumption month, with no written rule. Explains clause 6.5: baselines from the energy review over a suitable period, normalization where data show relevant variables significantly affect performance, three revision triggers and retained records. Shows how Alder Pharma set its 2025 chiller baseline and compares sound and risky baselines. Uses a February 2021 Winter Storm Uri baseline in Texas to show why the period must be representative. Recalculates the site model, 480 expected against 456 actual megawatt hours, then a 900 thousand pack exercise. Covers public weather data, four questions for auditing a model, and the revision triggers: indicators that no longer reflect performance, major static factor changes and a pre-determined method. Uses a London university's revision, writes two findings, and ends with a Hong Kong laundry exercise.

    What you will be able to do

    • Assess whether a baseline period is suitable, representative and supported by retained data
    • Recalculate expected versus actual energy from a normalization model and its data
    • Check that each baseline revision rests on one of the three clause 6.5 triggers

    Why it matters

    Protects every improvement claim from flattering baseline resets and arithmetic errors, so reported savings stand up to scrutiny.

    Practice: Practice: Energy baselines and normalization · 3 questions

  5. The energy data collection plan14 min

    Auditing the clause 6.6 energy data collection plan: key characteristics, required data, accurate and repeatable meters, and tracing a figure to its meter.

    What this module covers

    Begins with Alder Pharma's compressed air indicator, fed by a flow meter last verified four years ago. Explains clause 6.6: key characteristics identified, measured, monitored and analysed, a data plan appropriate to the site, and equipment that gives accurate and repeatable data, with retained records. Lists the data items a) to e), from relevant variables to data specified in action plans, and shows part of Alder Pharma's plan with each meter, frequency and indicator. Links the plan to the minimum key characteristics in clause 9.1.1. Covers calibration, cross-checks against billing meters and portable meter verification, then tracing one indicator value back to raw readings. Explains measurement uncertainty against small claimed savings, scaling the plan to the site, and plan reviews after the new tablet line. Includes an exercise, a Sydney water utility, findings on the flow meter and a missing humidity input, and a Boston hospital exercise.

    What you will be able to do

    • Check that the data plan covers relevant variables, SEU consumption and action plan data
    • Trace one reported indicator value back to meter readings and verification records
    • Assess whether meter accuracy is good enough to support the size of a claimed saving

    Why it matters

    Gives auditors a quick test of data quality, so indicators and baselines for significant energy uses are built on meters that can be trusted.

    Practice: Practice: The energy data collection plan · 3 questions

Part 4Auditing support, operation, evaluation and improvementApprox. 100 min

  1. Competence, awareness and communication14 min

    Auditing clauses 7.1 to 7.4: resources, energy competence and its evaluation, awareness of energy impact, communication and the suggestions process.

    What this module covers

    Opens with Alder Pharma packing line operators never given an energy briefing, and a night-shift line that ran compressed air for forty minutes while stopped. Explains clause 7.1 resources and the four competence duties in clause 7.2, using the clause 6.3 people list to decide who needs energy competence: the utilities engineer, line operators, the energy analyst and procurement. Shows how energy data proved a shutdown briefing worked, cutting night-time compressed air use during stoppages by thirty percent, and the forms competence evidence can take, including for top management and contractors. Sets out the four awareness items in clause 7.3 and how to test them with the right question, with a Mumbai textile mill's shift boards. Covers the clause 7.4 communication decisions, dependable information, and the process for comments and suggestions unique to ISO 50001. Writes two findings and ends with a Frankfurt bakery exercise.

    What you will be able to do

    • Determine which roles and contractors need energy competence from the SEU people list
    • Test awareness by asking people what they do in their job and why
    • Check that a process exists for anyone to comment on or suggest EnMS improvements

    Why it matters

    Takes the audit to the people who run significant energy uses, where much of the waste is found and stopped through awareness and suggestions.

    Practice: Practice: Competence, awareness and communication · 3 questions

  2. Documented information15 min

    Auditing clause 7.5 documented information: what ISO 50001 requires, maintain versus retain, creating, controlling and protecting energy records.

    What this module covers

    Starts with Alder Pharma's shared energy spreadsheet, editable by anyone with no version history, whose 2025 baseline tab was changed by an unknown person. Explains the two kinds of documented information in clause 7.5.1 and the difference between maintained documents and retained records. Lists the documented information required clause by clause, from scope and policy to baselines, indicator values, competence, monitoring results, audits and corrective action. Covers the identification, format and approval duties of clause 7.5.2 and the controls of clause 7.5.3, with integrity as the key risk. Explains why retention must outlast the baseline, a four-check sample on one indicator value, and control of external documents such as manuals and weather data. Uses a Hong Kong container port's locked records, sets out when missing documents are findings, writes findings on the spreadsheet and an overwritten dashboard, and ends with a Singapore shopping mall exercise.

    What you will be able to do

    • Distinguish maintained documents from retained records in an energy management system
    • Check that energy baseline and indicator records are protected from changes without trace
    • Identify which documented information ISO 50001 requires and which is optional

    Why it matters

    Makes sure the records that prove energy performance improvement still exist and cannot quietly change, so every comparison can be trusted.

    Practice: Practice: Documented information · 3 questions

  3. Operational planning and control14 min

    Auditing clause 8.1 operational control of SEUs: operating criteria, communicating them, sampling logs, maintenance, deviations, changes and outsourced SEUs.

    What this module covers

    Begins with Alder Pharma compressors set at 7.5 bar when no machine needed more than 6 bar; lowering the set point to 6.2 bar cut compressed air energy by about seven percent. Explains the four steps of clause 8.1: establish criteria where their absence can cause a significant deviation, communicate them, control to them, and keep enough records, with Alder Pharma's five percent deviation threshold. Lists six kinds of operating criteria, from set points and sequencing to maintenance, loading and alarms. Shows how to test communication by asking the operator on shift, and control by sampling thirty days of logs including nights and weekends. Covers maintenance, a criteria exercise and the chain from alarm to recorded response. Explains planned and unintended changes, outsourced SEUs controlled through procurement, and a Dubai data centre's cold aisle criteria. Writes two findings and ends with a Chicago hotel exercise.

    What you will be able to do

    • Check that operating criteria exist for each SEU where deviation would be significant
    • Sample control system logs to test whether SEUs run within their criteria
    • Assess how outsourced SEUs and planned changes are controlled for energy performance

    Why it matters

    Shows auditors where energy is lost day to day, in set points, maintenance and contractor-run plant, and how to prove control from the logs.

    Practice: Practice: Operational planning and control · 3 questions

  4. Design and procurement14 min

    Auditing clause 8.2 design and clause 8.3 procurement: energy performance over the operating lifetime, tender criteria, supplier notice and energy purchasing.

    What this module covers

    Opens with a replacement chiller bought on an eight percent lower price, while the rival bid was far more efficient at part load. Explains clause 8.2: considering energy performance improvement and operational control in the design of new, modified and renovated items with significant impact, and keeping design records. Shows good design practice with a new cleanroom air handling unit and covers modifications such as a packing line rebuild. Sets out the three duties of clause 8.3 and Alder Pharma's energy specifications for chillers, air handling units, compressors and motors. Compares the two chiller bids at 0.75 and 0.60 kilowatts per ton. Covers energy purchase specifications, service contracts, the link to policy commitments, and a Tokyo railway operator's train tenders. Writes findings on the chiller tender and the line rebuild, sets a compressor tender exercise, and ends with a Los Angeles film studio exercise.

    What you will be able to do

    • Check that design records for new or modified SEU equipment consider energy performance
    • Assess whether tenders for SEU equipment and services score energy over the operating lifetime
    • Write a measurable energy criterion for a tender with the evidence suppliers must provide

    Why it matters

    Helps organisations save energy before equipment is bought, avoiding twenty years of higher running costs from tenders decided on price alone.

    Practice: Practice: Design and procurement · 3 questions

  5. Monitoring and measurement15 min

    Auditing clause 9.1: the four minimum key characteristics, EnPI comparison with baselines, significant deviations and evaluation of compliance.

    What this module covers

    Opens with Alder Pharma's chilled water indicator running twelve percent above baseline from January to April 2026, with no comparison, no deviation logged and no investigation. Explains the four determinations in clause 9.1.1 and the four minimum key characteristics: action plan effectiveness, EnPIs, SEU operation and actual versus expected consumption, using the site model's 480 and 456 megawatt hours. Sets out the central rule of comparing indicator values with baselines, and how significant deviations are defined, investigated, responded to and recorded. Follows a five whys investigation to a change control process with no energy check, then reads the October 2026 report. Covers valid methods, evaluating performance and effectiveness, improvements outside SEUs and the flow into management review. Explains clause 9.1.2 compliance evaluation with the EU Energy Efficiency Directive deadlines, a Paris hospital group's weekly alerts, two findings, why logged deviations deserve praise, and a Sydney shopping mall exercise.

    What you will be able to do

    • Check that the four minimum key characteristics in clause 9.1.1 are monitored
    • Follow a significant deviation through investigation, response and retained records
    • Distinguish the evaluation of compliance in clause 9.1.2 from the internal audit

    Why it matters

    Helps auditors catch drifting energy performance within weeks, not months, and confirm that legal requirements are actually evaluated, not just listed.

    Practice: Practice: Monitoring and measurement · 3 questions

  6. Management review14 min

    Auditing clause 9.3 management review: who attends, the general and energy performance inputs, decisions as outputs, and tracing a decision to its result.

    What this module covers

    Starts with an Alder Pharma review whose minutes said only that the system was on track, with no indicator results, baseline comparisons, action plan status or decisions, while the chilled water indicator had drifted twelve percent. Shows how internal audit results become review inputs. Explains clause 9.3.1, the five general inputs in clause 9.3.2 and the energy performance inputs in clause 9.3.3, unique to ISO 50001: targets met, energy performance including the indicators, and action plan status. Tests inputs for content, not agenda ticks. Lists the seven outputs in clause 9.3.4 and Alder Pharma's decisions, from funding a compressor upgrade to adding an energy check to change control. Covers missed targets, split quarterly reviews, a New York university's review, and a four-step method: who, inputs, outputs and done. Gives interview tips, writes two findings, and ends with a Mumbai factory exercise on indicators that no longer fit.

    What you will be able to do

    • Check that management review includes the energy performance inputs of clause 9.3.3
    • Assess whether review outputs record decisions, including actions on missed targets
    • Trace one management review decision through to its result in the system

    Why it matters

    Ensures top management sees real energy results and takes decisions on them, so the review changes things rather than simply noting them.

    Practice: Practice: Management review · 3 questions

  7. Corrective action and improvement14 min

    Auditing clause 10: correction versus corrective action, root causes, effectiveness checks and demonstrating continual energy performance improvement.

    What this module covers

    Opens with Alder Pharma chillers found in the wrong order, reset and closed the same day, then wrong again three months later because nobody asked why. Explains the steps of clause 10.1: react and correct, evaluate the need to eliminate causes, implement, review effectiveness and change the system if necessary. Distinguishes correction from corrective action and follows a five whys analysis to a change process with no energy check. Shows why asking where else it could happen found another control logic error, and how energy data proved effectiveness six months later. Warns that human error is where analysis starts, not ends. Lists sources of nonconformities and ways to choose records to sample, and separates nonconformities from opportunities for improvement. Explains clause 10.2, continual rather than continuous improvement, ways to demonstrate it, a London retail chain's eleven percent fall, two findings, and a Singapore hotel exercise.

    What you will be able to do

    • Distinguish a correction from a corrective action that removes the root cause
    • Check that corrective action records ask where else a nonconformity could occur
    • Assess whether continual energy performance improvement is demonstrated across the scope

    Why it matters

    Stops repeat problems by testing that causes are found and removed, and that the organisation can prove its energy performance really improves.

    Practice: Practice: Corrective action and improvement · 3 questions

Part 5Planning, conducting and reporting the internal auditApprox. 74 min

  1. Planning the audit programme, plan, checklist14 min

    Planning an EnMS internal audit: a risk-based audit programme, objectives, scope and criteria, an audit plan that puts SEUs first, and an SEU checklist.

    What this module covers

    Begins with last year's one-line plan at Alder Pharma that worked through the manual and never reached a meter, leaving the chiller drift to be found by accident. Places planning in the ISO 19011:2026 audit flow, then sets out the clause 9.2.2 programme duties and how importance and previous results turn into priorities. Shows a programme grid with quarterly audits of the chilled water and compressed air SEUs, and how it changes when the new tablet line makes compressed air worse. Covers impartial auditors and technical experts, then defines objectives, scope and criteria for an audit of the chilled water SEU, and a Frankfurt data centre example. Builds a plan for the day, chooses on-site or remote methods, and prepares from four sources. Describes four checklist types, including an SEU-based checklist, contrasts weak and strong checklist lines, and closes with a planning exercise and four common mistakes.

    What you will be able to do

    • Plan an audit programme that gives most time to SEUs with higher risk and weaker results
    • Define the objectives, scope and criteria for a single EnMS internal audit
    • Write checklist questions that test the numbers rather than the existence of documents

    Why it matters

    Makes sure internal audits reach the plant room and the indicator calculations, where energy performance problems are actually found.

    Practice: Practice: Planning the audit programme, plan, checklist · 3 questions

  2. Conducting the audit part 113 min

    Conducting the audit, part one: the opening meeting, behaviour on site, guides, remote audit methods under ISO 19011:2026, and the human side of auditing.

    What this module covers

    Opens with an auditor who skipped the opening meeting and had a technician lower the compressor set point, tripping a packing machine and holding a tablet batch. Gives the three purposes of the opening meeting and the eight points to confirm, from objectives and plan to sampling, access to meter data and safety. Shows when a two-minute opening is enough, Alder Pharma's ten-minute chiller audit opening, and weak and strong openings. Sets out on-site rules: follow site rules, avoid disturbance and never touch set points or controls, plus guidance on photos, personal data and guides. Explains Table A.1 of remote and on-site methods and four rules for remote auditing, with a session reviewing chiller meter data by video from Boston. Covers seventeen qualities of a good auditor and five traits of a bad one, two interviews of the same technician, and two exercises.

    What you will be able to do

    • Run an opening meeting that confirms the plan, roles, access and safety arrangements
    • Apply on-site rules, including never operating equipment, set points or controls
    • Choose when remote audit methods fit the evidence and how to use them safely

    Why it matters

    Helps auditors open well, avoid disrupting operations and build the trust that leads people to share complete and accurate information.

    Practice: Practice: Conducting the audit part 1 · 3 questions

  3. Conducting the audit part 215 min

    Conducting the audit, part two: tracing an EnPI to its meters, verifying information, sampling, questioning, note taking and following one SEU end to end.

    What this module covers

    Starts with a trail from Alder Pharma's chiller indicator of 0.78 kilowatt hours per ton-hour back through the dashboard to two meters, one with an accuracy check eight months overdue. Explains investigating to the depth necessary and the ISO 19011 path from sources of information through sampling and verification to evidence, findings and conclusions. Sets out the four checks of complete, correct, consistent and current, and a Singapore data centre whose flat cooling line was an offline sub-meter. Compares judgement-based and statistical sampling and the risk that samples are not representative. Covers open and closed questions, leading questions and appreciative inquiry, tell me and show me, and whom to ask in an energy audit. Gives note-taking rules, then follows the chilled water SEU from clause 6.3 through 6.4, 6.5, 6.6, 8.1, 9.1 and 10.1. Adds guidance on context, leadership, risks and compliance, a defensible sample, and two exercises.

    What you will be able to do

    • Trace a reported EnPI value back to meter data and accuracy records
    • Verify information as complete, correct, consistent and current before using it as evidence
    • Follow one significant energy use through every related clause of ISO 50001

    Why it matters

    Turns claims of improvement into verified evidence, so auditors catch faulty meters and broken links that a clause-by-clause tick list would miss.

    Practice: Practice: Conducting the audit part 2 · 3 questions

  4. Findings, report and follow-up16 min

    Writing and grading EnMS audit findings, the closing meeting, the audit report under ISO 19011:2026, and following up corrective action until it works.

    What this module covers

    Starts with sharing findings as you go and reviewing each nonconformity with the auditee, seeking acknowledgement that the evidence is accurate rather than acceptance of the finding, with the Alder Pharma site director who disputes the chiller drift but agrees the facts. Explains how findings are generated and graded, and Sterling's major and minor grading, applied to four Alder Pharma examples. Covers improvement opportunities and good practice at a Dublin dairy, and four nonconformities that will not stand. Sets out the four parts of a nonconformity statement, with written examples against clause 8.1 for uncontrolled chiller changes and clause 6.6 for an overdue flow meter check, then weak and strong statements. Describes the closing meeting and audit report contents. Explains follow-up under clause 10.1, weak and strong responses, four ways a good finding dies, and a Manchester food factory exercise on operator error.

    What you will be able to do

    • Write a four-part nonconformity statement with criteria, evidence, statement and grade
    • Run a closing meeting with no surprises and a clear statement that the audit was sampled
    • Review a corrective action response and close it only on evidence that it works

    Why it matters

    Produces findings that process owners cannot argue with and management acts on, and makes sure each nonconformity closes only when the fix works.

    Practice: Practice: Findings, report and follow-up · 3 questions

  5. A practice audit and the exam15 min

    Brings ISO 50001 internal auditing together in six steps and a full practice audit of Alder Pharma's compressed air system, then explains the final exam.

    What this module covers

    Sets out six steps for an effective internal audit: start from the standard, understand the setting through context, interested parties, previous results and SEUs, check documents against the work, test objectives, competence and awareness, review controls, indicators and results, and close properly. Follows a practice audit of Alder Pharma's compressed air system by an independent finance analyst, with its scope across both shifts from July to September 2026, and criteria in clauses 6.3, 7.2, 7.3 and 8.1. Shows what she was told and what she checked: two of six technicians unaware of the 6.2 bar criterion, one contractor without an energy briefing record, and conforming alarm investigations and leak walks. Covers her two minor nonconformities, an improvement opportunity, a good practice and follow-up after sixty days. Lists four places audits go wrong, takeaways, a quick check, clause-naming practice, the thirty-question exam and how to start a first audit.

    What you will be able to do

    • Apply six steps to plan, conduct and close an EnMS internal audit of one area
    • Distinguish what an auditee says from what the audit evidence shows
    • Name the ISO 50001 clause, by number and title, that applies to an audit situation

    Why it matters

    Prepares learners to carry out their first internal audit of an energy management system in an area not their own, and to sit the final exam.

    Practice: Practice: A practice audit and the exam · 3 questions

Frequently asked questions

Your questions,
answered.

About ISO 50001:2018 Internal Auditor Training, its certificate and enrolment.

Ask Sterling
Is Sterling Academy a good choice for ISO 50001 training?

Yes. Sterling Academy's ISO 50001 courses are built by the Sterling consulting group, which has taken organisations to certification across 8,100+ client engagements in 60+ countries over 20+ years. They cover the awareness and internal auditor levels, always on the current edition, with practice questions that show the right answer. Each course ends with a final exam and a verifiable certificate that anyone can check online, plus a LinkedIn badge, and client administrators can show an auditor exactly who has been trained. You will be able to plan and conduct internal audits of your ISO 50001 management system, and face the certification audit with confidence. Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.

Who should take ISO 50001 internal auditor training?

It is for energy managers and energy team members, facilities, utilities and engineering staff, quality and environmental auditors adding ISO 50001, and process owners who run significant energy uses. It suits any organisation with an energy management system. Learners new to the standard may start with Sterling Academy's ISO 50001 awareness course.

What does the ISO 50001 internal auditor course cover?

It covers a clause-by-clause audit of ISO 50001:2018 and how to plan, conduct and report an internal audit following ISO 19011:2026. You learn to audit the energy review, significant energy uses, EnPIs, baselines and normalization, operating criteria, design and procurement, and whether energy performance really improved, then write nonconformities and follow up corrective action.

How are learners assessed in the ISO 50001 internal auditor course?

Three practice questions after every module let you check each audit skill, with an explanation for each answer; they are for practice only. The course ends with a scenario-based multiple-choice final exam. Learners who score 60% or more receive a Sterling Academy Certificate of Competence, and one retake is included. Each certificate carries a unique number and a QR code.

What will I be able to do after ISO 50001 internal auditor training?

You will be able to plan, conduct and report internal audits of your organisation's energy management system, as clause 9.2 of ISO 50001:2018 requires. You will build checklists, trace a significant energy use from the energy review to management review, test EnPIs against baselines, write nonconformities and verify that corrective actions work.

When will ISO 50001:2018 Internal Auditor Training be available?

The course is in preparation. Register on this page with “Notify me when it launches” and we will send you one e-mail when it opens for enrolment, with the price per learner and the details for team enrolment. The ISO 50001:2018 Internal Auditor Training course page will then show the full module list and the video runtime.

Your certificate

Prove what you learned.
Share it with confidence.

You will be able to plan and conduct internal audits of your ISO 50001 management system, and face the certification audit with confidence. Your certificate can be verified online in seconds, so certification body auditors, employers and clients can confirm your training instantly.

Reach the pass mark in the final exam and you receive a Sterling Academy Certificate of Competence, verifiable online by QR code, with a LinkedIn badge to share. Employers, clients and auditors can check it in seconds. Every learner who finishes the course receives a certificate: a Certificate of Completion when the retake does not reach the pass mark.

Pass mark
60%
Prerequisites
None

Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.

Ask about course requirements

Your next step

Get consulting from Sterling

Expert and experienced consultants, 8,100+ client engagements in 60+ countries, from gap assessment to a system ready for its certification audit.

Talk to a Sterling consultant

Not sure which course?

Plan your next step
in learning.

Discuss your learning needs