Annex 15 qualification and validation training is for the person who has to make a new building, line or process ready for EU supply and defend it at inspection: the validation lead writing the master plan, the engineer running IQ, OQ and PQ on a new filler, the QA reviewer asked whether three batches are enough, or the manager whose inspection report has just listed qualification and validation as a major deficiency.
This practitioner course works through EU GMP Annex 15 in the order a project runs: planning and the validation master plan, protocols, reports and deviations, user requirements to performance qualification, requalification, utilities and test methods, process validation by the traditional, continuous and hybrid approaches, ongoing process verification, packaging, transport and cleaning, and change control. It follows one project, a new beta-lactam capsule building at a manufacturer in Mumbai supplying the EU, from plan to release.
Annex 15 qualification and validation training teaches how to apply EU GMP Annex 15 to facilities, equipment, utilities and processes: planning with a validation master plan, qualifying from user requirements through IQ, OQ and PQ, validating processes by the traditional, continuous or hybrid approach, ongoing process verification, and controlling changes across the life cycle.
Training a team? Get a quote for your organisation
Part of: Pharmaceutical GMP and GDP Training
Part of: GMP & Medical Devices
Secure payment by Stripe · for yourself or for your team
What you get
About 3 hours, with captions. Watch at your own pace on any device.
Short questions check your understanding before you move on.
Multiple choice, with immediate retakes if you need them.
Industry experts, domain specialist trainers and globally renowned auditors with 30+ years in ISO and GRC.

Verifiable certificate with a QR code anyone can scan, plus a digital badge to add to your LinkedIn profile.
See how verification works →Standard and editionEU GMP Annex 15 Qualification and Validation (2015)
Last updated31 October 2026
Weak qualification and validation can take a whole site out of the EU market. The course opens with a case from this year.
In March 2026 the Croatian authority inspected two units of a sterile manufacturer in India on behalf of the EU. In one unit it found 7 critical and 9 major deficiencies, with the majors including qualification and validation, cleaning validation and cleaning practices, and computerised systems. Revocation of the GMP certificate was announced, marketing authorisation suspension was being addressed and recalls were considered.
Annex 15 itself is now under review. An EMA concept paper of January 2026, which drew on the lessons learnt from nitrosamine impurities in sartan medicines, proposes extending its scope to active substance manufacturers. Qualification and validation is moving up the inspection agenda, not down.
The course is for people who plan, execute, review or approve qualification and validation at manufacturers supplying the EU. It suits you if you are:
You will learn to plan and document qualification and validation in the way EU inspectors expect to see it.
Module 1, Why qualification and validation matter: a March 2026 EU inspection, the sartans lessons, the Annex 15 revision, the JKL project and the course.
Module 2, Annex 15 in EU GMP: what Annex 15 is, its scope and general rules, its links to other chapters and the revision.
Module 3, Planning and the validation master plan: life cycle planning, people and oversight, the VMP and its seven items, risk and data integrity.
Module 4, Protocols, reports and deviations: approval, document links, protocols, supplier documents, deviations, reports and stage release.
Module 5, User requirements, DQ, FAT and SAT: the qualification stages, user requirements, design qualification, and factory and site tests.
Module 6, IQ, OQ, PQ and requalification: installation, operational and performance qualification, worst case and requalification.
Module 7, Utilities and test methods: utility qualification and seasons, contact risks, method validation, recovery and transfer.
Module 8, Process validation, general principles: scope, the EMA guideline, bracketing, transfers, critical items, batch size and foundations.
Module 9, Traditional, continuous and hybrid: three batches, the protocol, the EMA guideline, continuous, hybrid and concurrent validation.
Module 10, Ongoing process verification: monitoring trends, protocol and report, statistics, the product quality review and decisions.
Module 11, Packaging, transport and cleaning: packaging qualification, transport verification and cleaning validation in outline.
Module 12, Change control under Annex 15: scope, design space, risk-based impact, approval with evidence and effectiveness checks.
Module 13, Putting it together at JKL Pharma: the full case, a road map and checklist, key takeaways and the final exam.
Annex 15, Qualification and Validation, is part of the EU GMP Guide, EudraLex Volume 4, and has been in operation in its current form since 1 October 2015. It applies to the facilities, equipment, utilities and processes used to make medicinal products for the EU, and expects decisions on scope and extent to rest on quality risk management.
Its main parts follow the life cycle: organising and planning, documentation including the validation master plan, the qualification stages from user requirements through design, installation, operational and performance qualification, requalification, process validation and ongoing process verification, verification of transport, validation of packaging, qualification of utilities, validation of test methods, cleaning validation, and change control. For process validation, point 5.20 accepts a minimum of three consecutive batches as generally acceptable, with alternatives justified.
Annex 15 works with the EMA guideline on process validation for finished products, which covers what to submit in the marketing authorisation. A revision of Annex 15 is proposed in the January 2026 concept paper; the course teaches the 2015 text in force.
You can fit this training course around shifts and deadlines. It runs online as 13 on-demand video modules, about 3 hours of video in total, on a laptop, tablet or phone, and it remembers where you stopped. Each module ends with practice questions that show straight away whether the point has landed. After key modules, 4 practice exercises give you a realistic task to work through, such as a validation plan outline for a new beta-lactam building, an OQ test plan for a blister line and a process validation protocol, and then show a model answer to compare with your own; they do not count toward the result.
The course closes with a scenario-based multiple-choice final exam drawn from the course question bank. Score 60% or more and you receive a Sterling Academy Certificate of Competence in your name, ready to file with your training records; if the first attempt falls short, one retake is included. You follow JKL Pharma, a built example: moving amoxicillin capsule manufacture into a new dedicated beta-lactam building in Mumbai, with a new capsule filler, blister line and purified water loop, for export to the EU.
You will be able to take on the qualification and validation tasks a new project or an inspection brings.
Validation projects cross engineering, production, QC and QA, and stall when each uses different terms. A company plan trains the whole project team on the same Annex 15 life cycle before the next qualification starts.
A client administrator adds people, assigns courses and follows progress through reports, so when an inspector or customer auditor asks who has been trained on what, the answer is ready. The organisation receives one invoice for the whole plan. Get a quote for your organisation and we will size the plan to your team.
Sterling Academy courses are built by industry experts, domain specialist trainers and globally renowned auditors with 30+ years of experience in ISO and GRC.
Sterling Academy is the training arm of Sterling International Consulting, with 8,100+ client engagements in 60+ countries over 20+ years. Every course teaches the current edition of its standard or guidance: this course reflects Annex 15 as in operation since October 2015 and the EMA concept paper on its revision of January 2026.
Preview this course
Watch a sample from Qualification and Validation Training (EU GMP Annex 15) before you enrol.
Inside the course
13 modules, 13 practice checkpoints, 4 practice exercises and a final exam. Video runtimes are approximate; allow additional time for the practice questions and the final exam. Modules marked optional can be skipped; the others are studied in any order.
EU GMP Annex 15 qualification and validation: a March 2026 EU inspection, the sartan lessons, the Annex 15 revision and how the course works.
Opens with a self-check: how would you rate your knowledge of Annex 15, where is your site's validation plan written down, and who approves it? Then presents an inspection carried out on behalf of the EU in March 2026 by HALMED, the Croatian medicines agency, at a sterile products manufacturer in India, where major deficiencies included qualification and validation, cleaning validation and computerised systems. Draws the lesson from the sartan impurities on why process knowledge matters, and explains that Annex 15 requires control of critical aspects over the whole life cycle, with a revision under way while the 2015 text still applies. Introduces JKL Pharma's oral solid dose site in Mumbai and its new beta-lactam building. Ends with the thirteen modules, four practice exercises, the final exam and a recap.
What you will be able to do
Why it matters
Seeing what inspectors found at a real site shows where your own validation programme is most likely to be challenged.
Practice: Practice: Why qualification and validation matter · 3 questions
Where EU GMP Annex 15 sits: its principle, scope, glossary, links to Chapters 1, 3, 4, 5 and 6 and Annex 11, and the proposed revision.
Starts with a contract manufacturer in Dublin, preparing for its first inspection after installing a new filling line, whose validation team had studied Annex 15 and nothing else, and could not say how the water system and air handling were reviewed each year because that requirement sits in Chapter 1. Explains that Annex 15 has been in operation since 1 October 2015, covering facilities, equipment, utilities and processes, with risk management throughout and no retrospective validation. Shows glossary terms such as process validation, the start of JKL's validation plan for the new building, and a map of where the chapters of Part One connect to Annex 15, including method verification by a laboratory that did not validate it. Ends with an active substance maker in Frankfurt preparing for the proposed revision, and a recap.
What you will be able to do
Why it matters
Reading Annex 15 with the whole GMP guide stops gaps like the annual qualification review that caught out a site in Dublin.
Practice: Practice: Annex 15 in EU GMP · 3 questions
Annex 15 section 1: life cycle planning, roles and quality oversight, the validation master plan (VMP), risk management and data integrity.
Opens with a packaging and contract manufacturing site in Milan and two versions of its validation master plan: a forty-page equipment list that could not say how much qualification a new line needed, and a shorter plan that could. Explains section 1 of Annex 15: qualification and validation planned over the life cycle, done by trained people under approved procedures, with quality oversight throughout. Covers the validation master plan, or an equivalent, which documents the system in at least seven items and is kept current, shown through JKL's plan in four steps and an extract of item three, the summary of systems and their status. Then covers documented risk assessments and data integrity checks, with a small site in Madrid. Ends with a recap and a practice exercise to outline the plan for JKL's beta-lactam building.
What you will be able to do
Why it matters
A master plan that is used tells you how much qualification a new line needs and who decides, before an inspector asks.
Practice: Practice: Planning and the validation master plan · 3 questions
Annex 15 section 2 documentation: qualification protocols, acceptance criteria, supplier documents, deviations, reports and staged release.
Starts with a site in Paris qualifying a drying oven, where an engineer widened a failed temperature mapping limit on the protocol and signed the test complete, with no deviation raised, until an inspector compared the approved and executed protocols. Explains section 2 of Annex 15: approval of documents, protocols that define critical systems, attributes and parameters with criteria approved before testing, and checking supplier and third-party documents before use. Shows a test sheet from JKL's protocols and a real failure handled well during operational qualification of JKL's new air handling unit, recorded as a deviation, investigated and justified. Covers reports that summarise against the criteria and recommend an outcome, and formal or conditional release from one stage to the next under section 2.6, with a site in Amsterdam. Ends with a recap.
What you will be able to do
Why it matters
Honest records beat clean ones; a failure handled as a deviation stands up to inspection, a quietly changed limit does not.
Practice: Practice: Protocols, reports and deviations · 3 questions
Annex 15 early qualification stages: user requirements specification (URS), design qualification (DQ), and FAT and SAT acceptance testing.
Opens with a packaging site in Hong Kong that bought a blister line for EU products and wrote its user requirements after delivery by copying the supplier's brochure, only to find the line could not seal its aluminium foil. Explains how user requirements build quality in from the start and remain the point of reference throughout the life cycle, and why the stages are a framework, not a rigid checklist. Covers design qualification, which demonstrates and documents that the design complies with GMP and meets the user requirements. Then covers factory and site acceptance testing before and after delivery, showing how JKL decides what factory tests can carry over, and a decision at a liquids maker in Dubai that supplies the EU, where transport could affect results. Ends with a recap.
What you will be able to do
Why it matters
Good user requirements drive everything after them and stop you buying equipment that cannot do the job you need.
Practice: Practice: User requirements, DQ, FAT and SAT · 3 questions
Annex 15 IQ, OQ and PQ: installation, operational and performance qualification, worst-case testing and periodic requalification.
Returns to the March 2026 EU inspection of an Indian sterile products manufacturer, where qualification and validation, premises and equipment, air flow studies and cleaning validation were among the major deficiencies. Explains installation qualification: verifying installation against drawings and criteria, collecting supplier information, calibrating instruments and verifying materials. Covers operational qualification, which tests limits and worst cases, and performance qualification, which shows effective, reproducible performance under normal conditions, and when it can be combined with operational qualification or process validation, with JKL's examples. Then covers evaluating systems at an appropriate frequency, justifying any fixed requalification period and considering small changes over time, with a contract packager in Milan that changed its approach. Ends with a recap and a practice exercise to plan OQ tests for JKL's new blister line.
What you will be able to do
Why it matters
Testing where things fail, not where they usually work, is what makes a qualification stand up when conditions change.
Practice: Practice: IQ, OQ, PQ and requalification · 3 questions
Annex 15 section 8 utilities qualification and section 9 analytical test method validation, with seasonal variation and method transfer.
Starts with a tablet maker near Paris whose air handling unit was qualified over four cool weeks in January, then failed humidity limits on hot summer afternoons, putting moisture-sensitive batches on hold. Explains section 8: utilities such as steam, water and air qualified through the same stages as equipment, over a period that reflects seasonal variation, with a risk assessment for direct and indirect product contact, such as compressed air in a coater spray. Covers section 9: analytical test methods validated for their use with detection and quantification limits where needed, recovery shown for microbial tests, and verification or transfer between laboratories, as with JKL's Mumbai laboratory and the importer's laboratory in the EU. Shows seasons at work at a sterile products site in Dublin. Ends with a recap.
What you will be able to do
Why it matters
Every result rests on the utilities and the methods; a winter-only qualification can put summer batches on hold.
Practice: Practice: Utilities and test methods · 3 questions
Annex 15 section 5 process validation general principles: process knowledge, critical quality attributes, critical process parameters and prerequisites.
Opens with a tablet made under contract near Milan, where a site transfer brought the batch record and specification but not the development data, so nobody knew why the granulation time had been set where it was. Explains that section 5 applies to all dosage forms and to new, modified and transferred processes, and that process knowledge must be accessible to the site. Covers how process validation establishes whether critical attributes and parameters are consistently met, with the basis for calling them critical documented, shown in an extract from JKL's list for moving its amoxicillin capsules into the new building. Then covers bracketing for strengths, and the prerequisites before the first validation batch at commercial scale: equipment, methods, trained people and qualified suppliers, with paragraph 5.12 at a liquids site in Amsterdam. Ends with a recap.
What you will be able to do
Why it matters
Validation starts with knowledge, not with batches; without it, three good batches say little about the next hundred.
Practice: Practice: Process validation: general principles · 3 questions
Annex 15 process validation approaches: traditional, continuous process verification, hybrid and concurrent validation, and what the QP must see.
Starts with a sterile products site near Madrid that chose concurrent validation for a product in short supply, then delayed certification by a week because the Qualified Person's validation results had not been compiled. Explains the traditional approach, usually at least three consecutive batches under routine conditions with the number justified by risk, and how an initial exercise may be supplemented by later batches. Covers continuous process verification for products developed by quality by design, shown at a tablet site near Frankfurt, and the hybrid approach that applies different approaches to different steps. Then covers concurrent validation as an exception, justified in the validation master plan, with results available to the Qualified Person before certification. Ends with a recap and a practice exercise to draft JKL's protocol with CQAs, CPPs and a sampling plan.
What you will be able to do
Why it matters
Choosing the approach and writing down the justification avoids delays at batch certification and questions at inspection.
Practice: Practice: Traditional, continuous and hybrid · 3 questions
Annex 15 ongoing process verification (OPV): protocols, statistical trending, the product quality review and when to revalidate.
Opens with a tablet site in Dubai where every batch met its hardness limits for twelve months, yet hardness rose slowly as press punches wore, until a batch failed dissolution, with a trend visible in data nobody had plotted. Explains that ongoing process verification applies after every validation approach and shows the process stays in a state of control throughout its lifecycle. Covers running it under an approved protocol, with a report and statistical tools, and reviewing and adjusting its extent, shown in how JKL's programme changes over the first year. Then covers how the product quality review in Chapter 1 documents the validated status and decides on actions or revalidation, with a trend doing its job at a liquids site in Hong Kong. Ends with a recap.
What you will be able to do
Why it matters
Looking at the trend, not only at each batch, catches slow drift months before it becomes a failed batch or a recall.
Practice: Practice: Ongoing process verification · 3 questions
Annex 15 packaging validation, transport verification and cleaning validation in outline, including worst-case limits and shipping routes.
Starts with a blister line at a tablet site near Milan, qualified at normal sealing settings, that later ran at top speed and low sealing temperature, producing leaking blisters and recalls. Explains qualifying primary and secondary packaging equipment, with primary packing tested at the minimum and maximum of its critical parameters. Covers transport verification: defined routes, risk-assessed variables and continuous monitoring of critical conditions, shown in an extract from JKL's transport risk assessment, a container waiting on the quayside in Mumbai, and an air shipment routed through Dubai. Then outlines cleaning validation for all product contact equipment, even in a dedicated facility, with limits from toxicology and no repeated cleaning to reach them, using JKL's plan for the new building. Ends with a recap.
What you will be able to do
Why it matters
Validation covers the product until it reaches the patient, including the sealing line, the shipping route and the cleaning.
Practice: Practice: Packaging, transport and cleaning · 3 questions
Annex 15 section 11 change control: impact assessment with quality risk management, design space, supporting data and effectiveness checks.
Opens with a tablet site in Amsterdam where a worn mixer blade was replaced with the supplier's current model as like for like, without a change record, and its different angle produced finer granules and softer tablets. Explains section 11 of Annex 15: change control for any planned change that may affect product quality or reproducibility, within the pharmaceutical quality system. Covers evaluating impact with quality risk management on quality, documentation, validation, regulatory status, calibration and maintenance, and checking changes against the registered design space under paragraph 11.3, with JKL's changes as examples. Then covers reviewing supporting data before final approval and checking effectiveness after implementation under paragraph 11.7, at a packaging site in Dublin. Ends with a recap and a practice exercise assessing a new aluminium foil supplier for JKL's blisters.
What you will be able to do
Why it matters
If it might affect quality, it goes through change control; skipping like for like changes is how validated processes drift.
Practice: Practice: Change control under Annex 15 · 3 questions
A complete Annex 15 case at JKL Pharma's beta-lactam building, from master plan to change control, with a road map, checklist and final exam.
Asks what JKL could show an inspector who walked into its new building tomorrow, then follows the amoxicillin capsules moving into a dedicated beta-lactam building as one connected story: the validation master plan, user requirements, design qualification and a traceability matrix linking each requirement to its test, protocols with criteria set in advance, reports, process validation, ongoing verification and change control. Confirms that the 2015 text of Annex 15 is the one in force. Gives a five-step road map for your own site, map, gap, fix, trend and extend, one product at a time, and a checklist of ten questions to run with the evidence in front of you. Ends with the key takeaways, a recap and how the scenario-based final exam, the 60% mark and the Certificate of Competence work.
What you will be able to do
Why it matters
Seeing the whole life cycle as one story shows what your site can put on the table, and the checklist tells you where to start.
Practice: Practice: Putting it together at JKL Pharma · 3 questions
Frequently asked questions
About Qualification and Validation Training (EU GMP Annex 15), its certificate and enrolment.
Ask SterlingYes. Sterling Academy's EU GMP courses are built by the Sterling consulting group, which has taken organisations to certification across 8,100+ client engagements in 60+ countries over 20+ years. They cover the awareness and specialist levels, always on the current edition, with practice questions that show the right answer. Each course ends with a final exam and a verifiable certificate that anyone can check online, plus a LinkedIn badge, and client administrators can show an auditor exactly who has been trained. You will be able to apply Qualification and Validation Training (EU GMP Annex 15) at work and show your competence with confidence. Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.
Awareness: EU GMP Inspection Readiness Training · Specialist: Biological Medicinal Products GMP Training
Annex 15 qualification and validation training teaches how to apply EU GMP Annex 15 to facilities, equipment, utilities and processes. It covers the validation master plan, protocols and reports, user requirements to performance qualification, process validation approaches, ongoing process verification, transport, packaging, test methods and change control.
Validation and qualification staff, QA staff and Qualified Persons, engineering and production managers, and consultants working for manufacturers that supply medicinal products to the EU need it. It is also useful for anyone moving into a validation role from production or engineering.
Installation qualification confirms equipment is installed as designed, operational qualification confirms it operates as intended across its range, and performance qualification confirms it performs consistently under normal operating conditions. Annex 15 also covers user requirements, design qualification and factory and site acceptance tests before them. Modules 5 and 6 cover all stages.
Annex 15 point 5.20 states that a minimum of three consecutive batches is generally acceptable for traditional process validation, with alternatives justified. The initial batches may need to be supplemented by ongoing process verification. Module 9 explains the traditional, continuous and hybrid approaches.
The course follows Annex 15 as in operation since 1 October 2015, the version currently in force. It also explains the EMA concept paper of January 2026 on revising Annex 15, including the proposal to extend its scope to active substance manufacturers.
The course takes about 3 hours of video across 13 modules, plus practice questions, four practice exercises and the final exam. Most learners spread it over several sessions, and the platform remembers where you stopped on any device, so it fits around project work.
Yes, you receive a Sterling Academy Certificate of Competence in your name when you score 60% or more in the final scenario-based multiple-choice exam. One retake is included if the first attempt does not reach the mark, and the certificate can be filed with your training records.
The course costs US$99 per learner, including the 13 video modules, practice questions, four practice exercises with model answers, the final exam and the certificate. For validation, engineering and QA teams, contact us for a quote for a company plan for your organisation.
Yes, a company plan is designed for this. A client administrator adds people, assigns the course, follows progress in reports and receives one invoice, so your engineers, validation specialists and QA reviewers start the next project with the same method.
Your certificate
You will be able to apply Qualification and Validation Training (EU GMP Annex 15) at work and show your competence with confidence. Your certificate can be verified online in seconds, so certification body auditors, employers and clients can confirm your training instantly.
Complete the course and its final exam and you receive a Sterling Academy Certificate of Completion, verifiable online by QR code, with a LinkedIn badge to share.
Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.
Ask about course requirementsYour next step
Not sure which course?