Get consulting from Sterling
Expert and experienced consultants, 8,100+ client engagements in 60+ countries, from gap assessment to a system ready for its certification audit.
Talk to a Sterling consultantPractitioner training · Good practice (GxP)
EU GMP Annex 1 training is what you need when your contamination control strategy has to stand up to an inspector, not just exist as a document. Perhaps your last inspection questioned your APS interventions or your grade A monitoring, perhaps you have been asked to own the CCS, or perhaps you have moved into sterility assurance and need the whole revised annex, its tables and its logic, clearly explained.
This practitioner course covers the 2022 Annex 1 end to end: its principles and dates, the contamination control strategy, premises, grades and airflow, RABS and isolators, qualification and disinfection, utilities, personnel and gowning, production routes, sterilisation and filtration, closing and container integrity, environmental monitoring, aseptic process simulation, QC and release. You follow one filling line at a sterile site in Singapore supplying the EU, and finish with a road map for your own site.
EU GMP Annex 1 training teaches the requirements of the revised Annex 1, Manufacture of Sterile Medicinal Products, in operation since August 2023: the contamination control strategy, cleanroom grades A to D, barrier technology, personnel and gowning, sterilisation and filtration, environmental monitoring, aseptic process simulation and quality control for sterile medicines supplied to the EU.
Training a team? Get a quote for your organisation
Part of: Pharmaceutical GMP and GDP Training
Part of: GMP & Medical Devices
Secure payment by Stripe · for yourself or for your team
What you get
About 3½ hours, with captions. Watch at your own pace on any device.
Short questions check your understanding before you move on.
Multiple choice, with immediate retakes if you need them.
Industry experts, domain specialist trainers and globally renowned auditors with 30+ years in ISO and GRC.

Verifiable certificate with a QR code anyone can scan, plus a digital badge to add to your LinkedIn profile.
See how verification works →Standard and editionEU GMP Annex 1 Manufacture of Sterile Medicinal Products (2022)
Last updated31 October 2026
Sterile manufacturing failures are among the reasons EU authorities stop supply, and 2026 has shown it twice. The course opens with both cases.
In March 2026 the Croatian authority inspected two units of a sterile manufacturer in India on behalf of the EU and found 7 critical and 9 major deficiencies in one unit and 3 critical and 12 major in the other. In October 2026 the French authority issued a statement of non-compliance to a maker of aseptically manufactured biosimilars, citing critical deviations in aseptic process simulation and inadequate assessment of their impact, observations on grade A and B monitoring, and major deficiencies in disinfection, transfers, visual inspection and cleanroom requalification. Its GMP certificate was withdrawn and supply of the inspected batches to the EU was banned.
EMA's 2025 annual report adds the wider picture: product contamination and sterility issues were among the main reasons for confirmed quality defects.
The course is for the people who design, run, monitor and release sterile manufacturing for the EU market. It suits you if you are:
You will learn what each part of Annex 1 requires and how the parts connect through the contamination control strategy.
Module 1, Why sterile manufacturing matters: two 2026 EU findings, EMA's 2025 figures, the site we follow and how the course works.
Module 2, Annex 1 at a glance: legal context, why Annex 1 was revised, its dates, scope, principles and structure.
Module 3, The contamination control strategy: what a CCS is, its sixteen elements, keeping it alive and the PQS for sterile products.
Module 4, Premises, grades and airflow: the four grades, room design, transfers, airlocks, pressure, smoke studies and alarms.
Module 5, RABS and isolators: why barriers, RABS versus isolators, background grades, gloves and decontamination.
Module 6, Qualification and disinfection: cleanroom qualification, Tables 1 and 2, requalification intervals and disinfection.
Module 7, Equipment and utilities: equipment design, maintenance, contact parts, utilities by risk, WFI, steam and gases.
Module 8, Personnel and gowning: training, gowning qualification, clothing by grade, behaviour and personnel monitoring.
Module 9, Production routes: terminal or aseptic, Tables 3 and 4, connections, interventions and time limits.
Module 10, Sterilisation and filtration: heat, radiation, ethylene oxide, sterile filtration, PUPSIT and redundant filters.
Module 11, Closing, inspection and technologies: closing and capping, container integrity, visual inspection, lyophilisation, single-use systems and blow-fill-seal.
Module 12, Environmental monitoring: the programme, alert and action limits, trending, Tables 5 and 6 and identification.
Module 13, Aseptic process simulation: APS design, interventions, frequency, units and incubation, and what follows a failure.
Module 14, QC, release and putting it together: bioburden, sterility testing, media, batch release, the whole annex, a road map and the exam.
Annex 1, Manufacture of Sterile Medicinal Products, is part of the EU GMP Guide, EudraLex Volume 4. The revised text was adopted in August 2022 and came into operation on 25 August 2023, with point 8.123 following on 25 August 2024. PIC/S member authorities apply the same text.
Its scope covers sterile active substances, excipients, primary packaging and finished dosage forms, across pack sizes, processes and technologies. The central change from the old annex is the contamination control strategy: a site-wide, documented strategy that links premises, equipment, people, utilities, processes, monitoring and quality systems, and is kept current.
The annex then sets the detailed expectations: cleanroom grades A to D and their limits, barrier technologies, personnel qualification (only staff who have completed gowning assessment and taken part in a successful APS may enter grade A and B unsupervised), sterilisation methods and sterile filtration, environmental and process monitoring, aseptic process simulation and quality control.
You can fit this training course around shifts and deadlines. It runs online as 14 on-demand video modules, about 3 hours of video in total, on a laptop, tablet or phone, and it remembers where you stopped. Each module ends with practice questions that show straight away whether the point has landed. After key modules, 4 practice exercises give you a realistic task to work through, such as reviewing part of a contamination control strategy, requalifying grade A and B areas and responding to a failed aseptic process simulation, and then show a model answer to compare with your own; they do not count toward the result.
The course closes with a scenario-based multiple-choice final exam drawn from the course question bank. Score 60% or more and you receive a Sterling Academy Certificate of Competence in your name, ready to file with your training records; if the first attempt falls short, one retake is included. You follow Line 2 at JKL Pharma's Singapore site, a built example: a heat-sensitive liquid injection, sterile filtered and filled into vials in grade A under a RABS, supplied to the EU through an importer's Qualified Person.
You will be able to tackle the Annex 1 tasks that fill a sterility assurance calendar.
A contamination control strategy only works if production, microbiology, engineering, QA and QC share it. A company plan puts every team that touches the sterile process through the same course, so the CCS is understood across the site, not just by its author.
A client administrator adds people, assigns courses and follows progress through reports, so when an inspector or customer auditor asks who has been trained on what, the answer is ready. The organisation receives one invoice for the whole plan. Get a quote for your organisation and we will size the plan to your team.
Sterling Academy courses are built by industry experts, domain specialist trainers and globally renowned auditors with 30+ years of experience in ISO and GRC.
Sterling Academy is the training arm of Sterling International Consulting, with 8,100+ client engagements in 60+ countries over 20+ years. Every course teaches the current edition of its standard or guidance: this course reflects the 2022 revision of Annex 1, in operation since August 2023, and the EMA annual report for 2025.
Preview this course
Watch a sample from Sterile Manufacturing Training (EU GMP Annex 1) before you enrol.
Inside the course
14 modules, 14 practice checkpoints, 4 practice exercises and a final exam. Video runtimes are approximate; allow additional time for the practice questions and the final exam. Modules marked optional can be skipped; the others are studied in any order.
Why sterile manufacturing under EU GMP Annex 1 matters, shown through 2026 EU inspection findings, and how the course follows one aseptic filling line.
Starts with a question: what does an EU inspector look for first at a sterile site? Not test results, but the design, people and strategy that keep contamination out. After a self-rating, two recent EU findings follow: the March 2026 HALMED inspection of two units of a sterile manufacturer in India, and a French statement of non-compliance for an aseptic biosimilar filler, with missing barriers, unrealistic airflow studies and weak simulations. You then meet JKL Pharma's sterile site in Singapore, where Line 2 fills a sterile-filtered liquid into vials in grade A under a RABS, plus a biologics filler in Dublin and a contract manufacturer in Frankfurt. The module outlines the fourteen modules, four practice exercises and final exam, and ends with a recap.
What you will be able to do
Why it matters
Seeing what EU inspectors rated critical shows where your own sterile site must have design, discipline and data in place.
Practice: Practice: Why sterile manufacturing matters · 3 questions
Covers the revised EU GMP Annex 1 at a glance: why it was rewritten, when it applies, its scope, principles and how its sections are organised.
Opens in 2022 with a contract manufacturer in Frankfurt whose head of production asks why lines that ran for fifteen years under the old Annex 1 must change. You then learn where Annex 1 sits in EU law, why it was revised, and that it was adopted in August 2022 and came into operation on 25 August 2023, with point 8.123 following in 2024. The module covers its scope, all sterile products from active substances to finished dosage forms, an ointment maker in Paris as a non-sterile contrast, and its limits as minimum requirements departed from only with justification. It explains the fixed order of risk control, design, then procedures, then monitoring, with terminal sterilisation preferred. You see JKL's gap review by section, including point 4.16 on alarms. It ends with a recap.
What you will be able to do
Why it matters
Knowing the structure and principles of the revised Annex helps you plan which lines and procedures must change, and why.
Practice: Practice: Annex 1 at a glance · 3 questions
Explains the Annex 1 contamination control strategy (CCS): what it must include, how it is kept current, and what the sterile quality system adds.
Returns to the 2026 inspection from Module 1, whose first critical finding was that the quality system did not cover sterile manufacturing, with inadequate deviation management and risk management not implemented. You then learn point 2.3 of the Annex in plain words: a contamination control strategy that defines critical control points across the facility and assesses every control and its monitoring together, from plant design onwards. The module answers whether a CCS means rewriting every procedure, gives one practical format built on the Annex points, and shows a contract manufacturer in Frankfurt using gamma-sterilised bags and an eye-drop maker in London using blow-fill-seal. It covers keeping the strategy alive through review and change, and the quality system's additions, including justified investigation scope. It ends with a recap and the first practice exercise, reviewing part of the strategy for Line 2.
What you will be able to do
Why it matters
A living strategy shows an inspector on one page how every control works together, instead of a binder nobody reads.
Practice: Practice: The contamination control strategy · 3 questions
Covers Annex 1 section 4 premises: cleanroom grades A to D, airlocks, personnel and material flows, pressure differentials, airflow and smoke studies.
Starts with two 2026 inspections that found problems in the premises themselves, including smoke studies that did not match the activities seen on the line, rated critical, and inadequate material transfer. You then learn the four grades: grade A as the critical zone where product is open, with unidirectional airflow shown across all of it, and grade B as its background. The module explains how people and materials enter through airlocks of increasing cleanliness, with interlocked doors, approved lists and one-way routes, using a hospital injectables maker in Paris building a new suite. It covers air moving from cleaner to less clean at about ten pascals between grades, continuous recording, alarms, and smoke studies in real operation with retained videos, applied to JKL's Line 2. It ends with a recap.
What you will be able to do
Why it matters
Premises designed so clean air moves the right way are the first contamination control, before any test is run.
Practice: Practice: Premises, grades and airflow · 3 questions
Explains Annex 1 barrier technology: RABS and isolators, their background grades, glove integrity testing and bio-decontamination.
Returns to the second unit of the Indian sterile site in 2026, where inadequate control of direct manual interventions in the critical zone was rated critical. You then learn the two barrier technologies, restricted access barrier systems and isolators, how they differ, and why the Annex says they should be considered for aseptic work, with any alternative justified in the strategy. The module covers background rooms: at least grade B for a RABS, and grade C for an open or grade D for a closed isolator, based on a written risk assessment, with a contract manufacturer in Frankfurt running an open isolator. It explains RABS door openings, frequent recorded glove checks, validated automated bio-decontamination with a sporicidal agent, and planning for failure, applied to JKL's Line 2. It ends with a recap.
What you will be able to do
Why it matters
A well-controlled barrier puts a wall between operators and product, removing the biggest source of contamination.
Practice: Practice: RABS and isolators · 3 questions
Covers Annex 1 cleanroom qualification and requalification against Table 1 and Table 2 limits, recovery time, and validated disinfection programmes.
Opens with 2026 findings at a Chinese biosimilar maker on requalification of a syringe filling cleanroom and ineffective cleaning and disinfection, and a critical gap at the Indian site. You then learn qualification: classification against Table 1 particle limits and microbial limits from Table 2, at rest and in operation, including grade B values per cubic metre, settle plate and contact plate. The module explains requalification at least every six months for grades A and B and every twelve for C and D, with filter integrity, airflow and pressure checks, and a recovery period, as a hospital injectables maker in Paris re-set after a new machine. It covers a validated disinfection programme with more than one agent, a periodic sporicidal and sterile agents in A and B, with an eye-drop maker in London. It ends with the second practice exercise.
What you will be able to do
Why it matters
Proving rooms clean at set intervals, and disinfecting with validated agents, keeps them as clean as the day they were built.
Practice: Practice: Qualification and disinfection · 3 questions
Explains Annex 1 sections 5 and 6: sterile equipment design, maintenance and cleaning, and utilities including water for injections and compressed gases.
Starts with the 2026 Indian inspection's critical finding of poorly designed equipment for dispensing, sampling and mixing, and major findings on cleaning validation. You then learn section 5: point 5.6 on qualifying, monitoring and maintaining sterilisers, air handling and water systems, point 5.7 on assessing unplanned maintenance for sterility impact, and sterilising direct and indirect contact parts. A supplier's single conveyor from the grade B filling room to capping shows why point 5.8 requires separate belts. The module covers section 6: utilities controlled by risk, gases filtered at the point of use, and water for injections, with point 6.7 on design, point 6.9 on turbulent flow against biofilm, daily sampling, and an eye-drop maker in London investigating an action limit excursion. It ends with a recap.
What you will be able to do
Why it matters
Controlling everything that touches the product, from needles to water, closes routes contamination takes before anyone sees it.
Practice: Practice: Equipment and utilities · 3 questions
Covers Annex 1 section 7 personnel: cleanroom training and qualification, aseptic gowning, aseptic behaviour, and personnel monitoring.
Returns to the 2026 Indian inspection, which rated non-compliant aseptic practices, training and behaviour critical in one unit and found gaps in garment sterility in another. You then learn who may enter grade A and B areas and how people are trained, assessed visually and microbially, included in a successful simulation and reassessed every year, so the busiest shift has been simulated first. The module explains gowning: a fresh sterile gown at each entry, enclosing all hair and facial skin, checked before, after and on exit. It covers aseptic behaviour, slow movement and clear first air, site phones for cleanroom use, a hospital supplier in Paris filling by hand, and visitors at a contract manufacturer in Frankfurt. It ends with Table 6 glove print limits and a recap.
What you will be able to do
Why it matters
Trained, well-gowned and watched people protect the product at the point where most contamination starts.
Practice: Practice: Personnel and gowning · 3 questions
Explains Annex 1 section 8 production: terminal sterilisation versus aseptic processing, grades from Tables 3 and 4, interventions and time limits.
Starts with the European Medicines Agency's 2025 annual report on suspected and confirmed quality defects in centrally authorised medicines. You then learn the first part of section 8: products are terminally sterilised wherever possible, because it gives greater sterility assurance, with a hospital supplier in Paris rethinking a stable saline filled aseptically for years. The module places each operation in its grade using Tables 3 and 4, with point 8.4 adding grade A with a grade C background where the strategy finds unusual risk. It covers aseptic work controlled through an authorised list of interventions evaluated by risk management and simulation, point 8.17 on recording every stoppage and intervention in the batch record, validated time limits, and a weekly observer at JKL. It ends with a recap.
What you will be able to do
Why it matters
Choosing the right route and controlling interventions removes risk by design and keeps the rest under control.
Practice: Practice: Production routes · 3 questions
Covers Annex 1 sterilisation by heat, radiation and ethylene oxide, depyrogenation, and sterile filtration with filter integrity testing and PUPSIT.
Opens with a 2026 finding at a Chinese biosimilar maker on handling particles in two hundred litre single use bags with an extra filter. You then learn that every load pattern and cycle is validated, critical parameters controlled and recorded with a unique identifier, and cycle records reviewed for batch certification, including point 8.45 for stoppers. The module explains heat as the method of choice, radiation and ethylene oxide where heat cannot be used, why ultraviolet is not acceptable, and point 8.68 on depyrogenation, with an eye-drop maker in London sterilising plastic containers. It covers sterile filtration with validated filters, tested before use after sterilisation and after use, routine filtration records, and a contract manufacturer in Frankfurt where PUPSIT would lose product. It ends with the third practice exercise.
What you will be able to do
Why it matters
Sterility assurance comes from validated, recorded processes, because no test can check every unit.
Practice: Practice: Sterilisation and filtration · 3 questions
Explains Annex 1 container closure integrity, capping, visual inspection of every parenteral unit, freeze drying, single use systems and blow-fill-seal.
Starts with 2026 findings: no validated container closure integrity procedure for ampoules at the Indian site, rated critical, and visual inspection gaps at the Chinese biosimilar maker. You then learn that containers are closed by validated methods, small fused units such as ampoules are integrity tested one hundred percent, and other closures are tested on samples under a justified plan, since visual inspection is not an integrity test. The module explains inspecting every filled parenteral unit by qualified people or validated machines, recording results and trending defects. It covers the specific technologies in section 8: freeze drying, closed and single use systems, form-fill-seal with film controls, and blow-fill-seal, with an eye-drop maker in London. It ends with a recap.
What you will be able to do
Why it matters
Closing every container properly and checking every unit finds the one cracked or contaminated unit among thousands.
Practice: Practice: Closing, inspection, technologies · 3 questions
Covers Annex 1 environmental monitoring: programme design, alert and action levels, Table 5 and Table 6 limits, trending and microbial identification.
Returns to the French statement on the Chinese biosimilar maker, whose critical finding included observations on monitoring in grade A and B areas. You then learn that the monitoring programme is part of the strategy, designed by risk assessment and read as a whole. The module explains alert levels that catch deterioration early and action limits, at most the values in Tables 5 and 6, that trigger root cause, product impact including batches made before the result, and CAPA. It covers grade B microbial limits for air, settle plates, contact plates and gloves, continuous grade A monitoring and identifying isolates. You see a pattern on JKL Pharma's Line 2, a hospital supplier in Paris with excursions after maintenance, and a contract manufacturer in Frankfurt seeking faster results. It ends with a recap.
What you will be able to do
Why it matters
Reading monitoring data as a pattern tells you quickly when controls are slipping, before contamination reaches product.
Practice: Practice: Environmental monitoring · 3 questions
Explains aseptic process simulation (media fill) under Annex 1 points 9.32 to 9.49: design, worst cases, frequency, acceptance and failed runs.
Opens with the French authority's October 2026 statement, whose only critical finding began with deviations in the aseptic process simulation and weak assessment of their product impact. You then learn how a simulation imitates the routine process as closely as possible, with its interventions and worst cases, using point 9.36 for planning and air in place of the nitrogen overlay used for the product. The module covers growth promotion of filled units with reference organisms and local isolates, full documentation with reconciliation of units, and frequency: three consecutive successful runs at first, then about every six months per line and shift, with every operator once a year. It explains zero growth as the target, and investigation, quarantine and repeat runs after one contaminated unit, with a hospital supplier in Paris. It ends with the fourth practice exercise.
What you will be able to do
Why it matters
Simulating the real process at its worst shows whether aseptic filling works, without risking a real batch.
Practice: Practice: Aseptic process simulation · 3 questions
Covers Annex 1 section 10 quality control and sterile batch release, then puts the course together with a contamination control road map.
Starts with the scale of EU oversight in 2025: inspections requested by the European Medicines Agency's committees, statements of non-compliance, and GMP certificates recorded. You then learn section 10: bioburden tested on every batch, the sterility test as the last of many controls, samples from the start and end of the batch and after critical interventions, growth promotion of media, as a contract manufacturer in Frankfurt changed, and a procedure for out of trend data. An eye-drop maker in London treats each steriliser load as a sub-batch with its own sterility test, under point 10.6. You see JKL's review pack for certifying a Line 2 batch. The module ends with a road map, map one line, compare it with the Annex, rank gaps, fix them through change control and measure, plus the final exam.
What you will be able to do
Why it matters
Certifying a batch on complete records, not one test, reflects that sterility is assured by the whole system.
Practice: Practice: QC, release, putting it together · 3 questions
Frequently asked questions
About Sterile Manufacturing Training (EU GMP Annex 1), its certificate and enrolment.
Ask SterlingYes. Sterling Academy's EU GMP Annex 1 training is built by the Sterling consulting group, which has taken organisations to certification across 8,100+ client engagements in 60+ countries over 20+ years. It is always on the current edition, with practice questions that show the right answer. Each course ends with a final exam and a verifiable certificate that anyone can check online, plus a LinkedIn badge, and client administrators can show an auditor exactly who has been trained. You will be able to apply Sterile Manufacturing Training (EU GMP Annex 1) at work and show your competence with confidence. Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.
EU GMP Annex 1 training teaches the requirements for manufacturing sterile medicines for the EU, as set out in the revised Annex 1 of EudraLex Volume 4. It covers the contamination control strategy, cleanroom grades, barrier technology, personnel, sterilisation, filtration, monitoring, aseptic process simulation and quality control.
Sterile production operators and supervisors, sterility assurance and microbiology staff, QA, QC and validation staff, engineers, Qualified Persons and managers at sites that make sterile medicines for the EU market need it, wherever the site is located. The course also suits staff moving into sterile work from non-sterile areas.
Yes, the course is built entirely on the revised Annex 1 adopted in August 2022 and in operation since 25 August 2023, including point 8.123, which applied from 25 August 2024. Module 2 explains why the annex was revised and what changed.
A contamination control strategy is a documented, site-wide plan that defines how microbial, particulate and endotoxin contamination is controlled across premises, equipment, people, utilities, processes and monitoring. Annex 1 requires one for sterile manufacturing. Module 3 covers its elements and how to keep it current.
Both are barriers that separate operators from the grade A zone. An isolator can sit in a grade C background (open) or grade D (closed), based on a risk assessment justified in the CCS; a RABS needs at least a grade B background. Module 5 compares them in detail.
The course takes about 3 hours of video across 14 modules, plus practice questions, four practice exercises and the final exam. Most learners spread it over several sessions, and the platform remembers where you stopped on any device, so it fits around shift patterns.
Yes, you receive a Sterling Academy Certificate of Competence in your name when you score 60% or more in the final scenario-based multiple-choice exam. One retake is included if the first attempt does not reach the mark, and the certificate can be filed with your training records.
The course costs US$99 per learner, including the 14 video modules, practice questions, four practice exercises with model answers, the final exam and the certificate. For sterile teams across a site or group, contact us for a quote for a company plan for your organisation.
Yes, a company plan is designed for this. A client administrator adds people, assigns the course, follows progress in reports and receives one invoice, so production, microbiology, engineering and QA complete the same Annex 1 preparation before an inspection or a CCS review.
Your certificate
You will be able to apply Sterile Manufacturing Training (EU GMP Annex 1) at work and show your competence with confidence. Your certificate can be verified online in seconds, so certification body auditors, employers and clients can confirm your training instantly.
Complete the course and its final exam and you receive a Sterling Academy Certificate of Completion, verifiable online by QR code, with a LinkedIn badge to share.
Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.
Ask about course requirementsYour next step
Not sure which course?