Get ISO/IEC 17025 consulting from Sterling
Expert and experienced consultants, 8,100+ client engagements in 60+ countries, from gap assessment to a system ready for its certification audit.
Talk to a Sterling consultantPractitioner training · Laboratory competence
Part of the ISO/IEC 17025:2017 learning path → Step 3
Online training course to build a laboratory management system that delivers valid results and is ready for accreditation.
This practitioner training course covers implementing ISO/IEC 17025:2017: for every clause, what it asks for, how to put it in place in your own laboratory, what records it produces and how to check that it works. A testing and calibration laboratory in Dubai runs through the course.
What you get
About 6 hours, with captions. Watch at your own pace on any device.
Short questions check your understanding before you move on.
Score at least 60% to receive the Certificate of Competence.
Industry experts, domain specialist trainers and globally renowned auditors with 30+ years in ISO and GRC.

Verifiable certificate with a QR code anyone can scan, plus a digital badge to add to your LinkedIn profile.
See how verification works →Standard and editionISO/IEC 17025:2017
Last updated27 October 2026
Preview this course
Watch a sample from ISO/IEC 17025:2017 Implementation Training before you enrol.
Learning outcomes
Connect the subject to the responsibilities and decisions people encounter in their roles.
Inside the course
26 modules, 26 practice checkpoints, 7 practice exercises and a final exam. Video runtimes are approximate; allow additional time for the practice questions and the final exam. Modules marked optional can be skipped; the others are studied in any order.
Introduces ISO/IEC 17025:2017, what its third edition changed, and why laboratories are accredited, not certified, following XYZ Ltd. in Dubai.
This training course opens with the question of how a laboratory knows its last result was right, and why a laboratory sells trust in its results. Covers the scope in clause 1, the objective of the standard, the meaning of shall, should, may and can, and the three main changes in the third edition. Explains accreditation against certification. Follows XYZ Ltd., a testing and calibration laboratory in Dubai, with a food microbiology laboratory in Singapore as a second example.
What you will be able to do
Why it matters
A laboratory sells trust in its results, and a system that shows how each result is traceable can close a customer's audit in minutes.
Practice: Practice: Welcome: why accreditation matters · 3 questions
Defines the terms of ISO/IEC 17025:2017, including impartiality, complaint, laboratory, proficiency testing, decision rule, verification and validation.
Starts with a drinking-water method at XYZ Ltd. where the word validated creates an assessment finding. Covers the two normative references in clause 2, ISO/IEC Guide 99 and ISO/IEC 17000, then the nine terms of clause 3 in three groups: trust and feedback, comparing results with others, and deciding and showing that something is fit. Includes the difference between verification and validation, and three short situations to decide.
What you will be able to do
Why it matters
One wrong word, such as validated for verified, can create a finding, so using the standard's terms the same way every time protects you.
Practice: Practice: The language of the laboratory · 3 questions
Shows how ISO/IEC 17025:2017 is structured, the choice of Option A or Option B, the gap assessment and the range of laboratory activities to claim.
Compares two ways XYZ Ltd. could begin: writing a manual first, or assessing gaps first. Walks through the eight clauses and two annexes, three questions that group clauses 4 to 8, and the order of clause 7. Explains Option A and Option B for the management system, the route to accreditation, a five-step gap assessment, and the range of laboratory activities in clauses 5.3 and 5.4.
What you will be able to do
Why it matters
Finding gaps first lets you fix those that threaten results before writing paperwork, and a range drawn honestly is what you are assessed against.
Practice: Practice: How the standard is built · 3 questions
Explains impartiality under clause 4.1: management commitment, commercial and financial pressure, and how to identify and deal with risks to impartiality.
Opens with XYZ Ltd. and a hotel group that asks for a retest of a result it dislikes. Sets out the five parts of clause 4.1 and the three pressures named in clause 4.1.3, then the sources of risk listed in the note: ownership, management, shared resources, finances, marketing and sales commission. Gives five steps to put it in place, with an impartiality risk register and a declaration of interests.
What you will be able to do
Why it matters
When someone presses for a different result, clear rules and a record protect the one thing customers pay for: trust in the result.
Practice: Practice: Impartiality in the laboratory · 3 questions
Covers confidentiality under clause 4.2: legally enforceable commitments, the four situations the clause names, and how to protect customer information.
Begins with a brochure at XYZ Ltd. that names a hotel group without its agreement. Sets out the four parts of clause 4.2 and what all information covers, from samples and drafts to what staff see at a customer's site. Explains legally enforceable commitments and the four situations: going public, a release the law requires, information from other sources, and agreed sharing. Examples include a regulator's request and a food microbiology laboratory in London.
What you will be able to do
Why it matters
Customers who are never surprised by what you publish or release keep trusting the laboratory with their samples and data.
Practice: Practice: Confidentiality of information · 3 questions
Covers the structural requirements of clause 5: legal entity, management, range of activities, structure, the quality role and planning change.
Opens with XYZ Ltd. and a new mobile van where nobody checks on-site certificates. Takes the seven parts of clause 5 in turn: legal entity and overall management, the range and the sites where work is done, the organisation chart and a laboratory's place in a parent organisation, and the five duties of the quality role. Closes with communication and keeping the system sound during change, using a factory laboratory in Mumbai and a testing laboratory in Sydney.
What you will be able to do
Why it matters
Clear roles catch problems early, such as a wrong unit on a certificate that is found before the certificate leaves the laboratory.
Practice: Practice: Structural requirements · 3 questions
Explains resources and personnel under clauses 6.1 and 6.2: competence, selection, training, supervision, authorisation and monitoring of people.
Starts with a new technician at XYZ Ltd. who signs certificates before anyone has authorised him. Covers the general resource requirement in clause 6.1, then clause 6.2 and its external personnel. Takes documented competence requirements for each function, competence to judge deviations, the six steps with procedures and records in clause 6.2.5, and authorisation in clause 6.2.6 with an authorisation matrix. Examples come from food microbiology in Singapore and a night-shift chemist in Mumbai.
What you will be able to do
Why it matters
When a customer asks who allowed a person to sign, you can answer from the records: competent first, then authorised by name.
Practice: Practice: Resources and personnel · 3 questions
Covers facilities and environmental conditions under clause 6.3: monitoring, controlling and recording conditions, including work at customers' sites.
Begins with XYZ Ltd. calibrating balances beside a loading door and a fan in a customer's packing hall. Lists the influences named in the note to clause 6.3.1, then the five parts of clause 6.3: suitable facilities, documented requirements, monitoring, control and records, measures such as access and separation, and work outside permanent control. Includes an alert, stop, fix, look back and record rule, an on-site checklist, and laboratories in London and Toronto.
What you will be able to do
Why it matters
The room is part of the measurement: a record of conditions on the day links every result to the conditions it was produced in.
Practice: Practice: Facilities and environmental conditions · 3 questions
Explains equipment under clause 6.4: handling, verification, the calibration programme, intermediate checks, out-of-service rules and equipment records.
Begins with an overdue reference gauge at XYZ Ltd. that puts forty certificates in question. Defines equipment broadly, including software, measurement standards and reference materials, then takes clause 6.4 in order: the handling and maintenance procedure, verification before service, capability, which equipment needs calibration, the calibration programme and status labels. Covers equipment in doubt, intermediate checks, corrections, protection from unintended adjustment, and the equipment records of clause 6.4.13.
What you will be able to do
Why it matters
Showing that equipment is fit for use, instead of assuming it, protects every certificate issued since the last good check.
Practice: Practice: Equipment and its calibration · 3 questions
Explains metrological traceability under clause 6.5 and Annex A: an unbroken chain of calibrations to the SI, and how to show each link is competent.
Starts with a reference thermometer sent to a low-cost provider whose certificate states no uncertainty and no traceability. Defines metrological traceability as a documented, unbroken chain of calibrations, then covers the three routes to the SI in clause 6.5.2, the cases where the SI is not technically possible in clause 6.5.3, and certified reference materials in a water laboratory. Annex A is explained through class weights, provider scopes and a traceability record for pressure.
What you will be able to do
Why it matters
If you can trace one result back link by link in a few moments, you can show a customer's auditor or an assessor that your results hold up.
Practice: Practice: Metrological traceability · 3 questions
Covers externally provided products and services under clause 6.6: approving providers, checking what comes in, and work sent to another laboratory.
Opens with a cheaper culture media supplier at XYZ Ltd. whose first batch is used without a check. Explains the three situations in clause 6.6.1, the procedure and records of clause 6.6.2 (requirements, criteria for providers, checks before use and resulting actions), and what to tell providers under clause 6.6.3. Includes an approved provider list, laboratory work done by another laboratory, and a contractor re-evaluation at a testing laboratory in Sydney.
What you will be able to do
Why it matters
Checking a purchase before it touches a result stops one weak batch or one missing certificate from putting a week of results in doubt.
Practice: Practice: Externally provided products and services · 3 questions
Explains the review of requests, tenders and contracts under clause 7.1, including agreeing a decision rule with the customer before the work starts.
Opens with a property developer asking XYZ Ltd. to test water from one hundred and twenty apartments in one week. Sets out the four points of clause 7.1.1, a five-step review, telling a customer when a requested method is out of date, and the decision rule defined in clause 3.7 and agreed under clause 7.1.3. Covers contract changes, cooperation with customers, review records, and examples from laboratories in Toronto and London.
What you will be able to do
Why it matters
Saying yes only when you can deliver means results arrive on time and valid, and the customer knows how conformity will be judged.
Practice: Practice: Review of requests, tenders and contracts · 3 questions
Explains selecting and verifying methods under clause 7.2.1: the latest valid version, verification before use, method development and deviations.
Opens with a revised drinking-water method that XYZ Ltd. fails to notice. Separates verification in clause 3.8 from validation in clause 3.9, then takes the seven parts of clause 7.2.1: appropriate methods, up-to-date documents, the latest valid version, choosing a method when the customer names none, verification before introduction, planned method development, and four conditions for deviations. Includes a four-step verification approach, a method register, and examples from Mumbai and Singapore.
What you will be able to do
Why it matters
A method proven somewhere must be shown to work in your laboratory, and a dated verification record is the evidence behind each early report.
Practice: Practice: Selecting and verifying methods · 3 questions
Explains validation of methods under clause 7.2.2: which methods to validate, performance characteristics, changes to validated methods and the five records.
Opens with a food microbiology laboratory in Singapore that shortens an incubation time and loses a bakery chain's trust. Separates verification from validation, then takes the four parts of clause 7.2.2: the four kinds of method to validate, changes to a validated method, performance characteristics relevant to the customer's needs, and five records ending in a statement of fitness. Examples include swimming-pool water at XYZ Ltd. and a construction-materials laboratory in London.
What you will be able to do
Why it matters
A changed method is a new method, and validating it with criteria set before the data gives you evidence behind every report.
Practice: Practice: Validating methods · 3 questions
Covers sampling under clause 7.3 and handling of test or calibration items under clause 7.4, from the sampling plan to identification, receipt and storage.
Compares loose and careful sampling of drinking water at a hotel served by XYZ Ltd. Takes clause 7.3 in three parts: the sampling plan and method, what the method describes, and the eight kinds of sampling record. Then covers clause 7.4: the handling procedure from transportation to disposal or return, unique identification of items, recording deviations on receipt and consulting the customer, and storage conditions. Examples come from laboratories in Mumbai and Manila.
What you will be able to do
Why it matters
A result is only as strong as its sample, so being able to walk back from a report to the moment of sampling makes the result defensible.
Practice: Practice: Sampling and handling items · 3 questions
Explains technical records under clause 7.5 and the evaluation of measurement uncertainty under clause 7.6 for calibration and testing laboratories.
Opens with a queried temperature probe certificate that XYZ Ltd. cannot rebuild from a pad of notes. Covers the content of technical records in clause 7.5.1, recording at the time and tracking amendments. Explains measurement uncertainty with a suitcase weighed on a bathroom scale, then the contributions in clause 7.6.1, the duties in clauses 7.6.2 and 7.6.3, a common route for an evaluation, and an uncertainty budget for pressure gauges.
What you will be able to do
Why it matters
A record made at the time can be defended, and a result stated with its uncertainty can be judged by the customer who relies on it.
Practice: Practice: Technical records and uncertainty · 3 questions
Explains ensuring the validity of results under clause 7.7: internal monitoring, control charts, proficiency testing and acting on data outside criteria.
Opens with a check weight chart at XYZ Ltd. that drifts for six weeks while staying inside its limits. Takes the three parts of clause 7.7: a monitoring procedure whose data shows trends, the eleven activities it includes where appropriate, and comparison with other laboratories through proficiency testing or other interlaboratory comparisons. Covers control chart rules, four habits for proficiency testing, and analysing data and acting before an incorrect result is reported.
What you will be able to do
Why it matters
Watching the trend, not only the limit, catches a drift in its first week, before any certificate has to be recalled.
Practice: Practice: Ensuring the validity of results · 3 questions
Covers reporting of results under clause 7.8: what every report must contain, and what test reports, calibration certificates and sampling reports add.
Opens with a food microbiology laboratory in Toronto whose report does not say the customer took the sample. Takes clause 7.8.1, review and authorisation before release, and the list in clause 7.8.2.1 in two halves, then customer-provided information and results from external providers. Covers what test reports, calibration certificates and sampling reports add, including measurement uncertainty, and the rule that a certificate recommends no calibration interval unless agreed.
What you will be able to do
Why it matters
A good report says what the result covers and what it does not, which settles disputes about sampling or meaning in a day, not weeks.
Practice: Practice: Reporting results · 3 questions
Explains statements of conformity and the decision rule in clause 7.8.6, opinions and interpretations in clause 7.8.7, and report amendments in clause 7.8.8.
Begins with XYZ Ltd. and a factory that read the same gauge result as in tolerance and as possibly out, because no rule was agreed. Explains the decision rule with a suitcase example of simple and guarded acceptance, false accept and false reject, and what a statement of conformity must identify. Then covers who may release opinions and interpretations, recording spoken ones, and amending an issued report by a further document or a new report.
What you will be able to do
Why it matters
A verdict agreed before anyone sees the number stands up when a customer's auditor adds the uncertainty and looks again.
Practice: Practice: Conformity, opinions and amendments · 3 questions
Covers complaints under clause 7.9 and nonconforming work under clause 7.10: handling a complaint, risk-based actions and looking back at past results.
Opens with a failed air conditioner in XYZ Ltd.'s calibration room and two ways to respond. Takes the complaints process: receive, validate, investigate, decide by someone not involved, and close. Then the nonconforming work procedure with its six points, XYZ Ltd.'s risk levels, impact analysis on previous results, records under clauses 7.10.2 and 7.10.3, and corrective action. Examples include a construction-materials laboratory in Sydney.
What you will be able to do
Why it matters
A customer who hears about a problem from you first, with a look back at past results, has a reason to stay.
Practice: Practice: Complaints and nonconforming work · 3 questions
Explains control of data and information management under clause 7.11: validating systems and changes, protecting data and checking calculations.
Opens with a software update at XYZ Ltd. that rounds water results to one decimal place without anyone noticing. Takes the six parts of clause 7.11 and what the laboratory information management system includes, computerised and non-computerised. Covers validation of the system and of each change before use, protection against unauthorised access, tampering and loss, recording failures, systems run by an external provider, and checks of calculations and data transfers, with laboratories in Sydney and Singapore.
What you will be able to do
Why it matters
Checking every change before anyone relies on it finds a setting error within an hour, not after a week of reports.
Practice: Practice: Data and information management · 3 questions
Explains Option A and Option B for the management system, and the control of management system documents and records under clauses 8.1 to 8.4.
Opens with a printed procedure in XYZ Ltd.'s van that was not updated, so eighteen gauges were calibrated at the old points. Compares Option A, with the eight elements of clauses 8.2 to 8.9, with Option B for a laboratory that has an ISO 9001 system, and what Annex B adds. Then covers policies and objectives in clause 8.2, a recommended document structure, the six document controls of clause 8.3.2, and records under clause 8.4 with a records register.
What you will be able to do
Why it matters
One current version at every bench and van, and records you can find, keep the whole laboratory working the same way.
Practice: Practice: Options A and B, documents and records · 3 questions
Covers risks and opportunities in clause 8.5, improvement and customer feedback in clause 8.6, and corrective actions in clause 8.7.
Opens with XYZ Ltd. losing customers when the only technician authorised on its dead-weight tester leaves. Explains why a laboratory considers risks and opportunities, planning actions in proportion, and why no formal risk method is required. Then covers integrating and evaluating actions, sources of improvement, seeking positive and negative customer feedback, and the corrective action steps, including asking why repeatedly, with examples from London, Hong Kong and Manila.
What you will be able to do
Why it matters
Thinking ahead, in proportion to what could go wrong, keeps work flowing when a key person or provider is lost.
Practice: Practice: Risks, improvement, corrective actions · 3 questions
Explains internal audits under clause 8.8 and management reviews under clause 8.9: planning an audit programme and turning review inputs into decisions.
Opens with a food microbiology laboratory in New York whose management review only noted a doubtful proficiency testing result. Covers the audit programme in clause 8.8.2, weighting by importance, change and past results, and auditing by following one report back to the bench. Then the fifteen inputs of clause 8.9.2, a way to run the meeting, and the outputs of clause 8.9.3, with an example finding from XYZ Ltd.'s van.
What you will be able to do
Why it matters
An audit that finds and a review that decides let your laboratory correct gaps before an accreditation assessor sees them.
Practice: Practice: Internal audits and management reviews · 3 questions
Lists the procedures, documents and records that ISO/IEC 17025:2017 requires, and separates them from what is left to the laboratory's choice.
Compares a laboratory that buys sixty procedures with XYZ Ltd., which starts from the standard. Shows how to read shall have a procedure, shall document and shall retain records. Lists the eight topics that need a procedure, four further written arrangements, the items to document, and three groups of records from clauses 6, 7 and 8, then what is your choice. A document map and a cross-reference table bring the clauses of this training course together.
What you will be able to do
Why it matters
Writing what is required and keeping every record gives a smaller set of documents that people use and an assessor can follow.
Practice: Practice: The procedures and records you need · 3 questions
Sets out a dated road map to accreditation in eight phases, with how to choose an accreditation body, what the assessment involves and readiness checks.
Compares a water testing laboratory in Manila that applies in a rush with XYZ Ltd. in Dubai, which builds and runs its system first. Lays out the eight phases, a gap assessment and dated plan, the items that take longest, and how to choose an accreditation body. Describes in general terms the assessment, closing findings at their cause, surveillance and extending the range, then eight readiness checks and the key takeaways of the training course.
What you will be able to do
Why it matters
Accreditation follows a system that already runs, so months of records behind every requirement matter more than a rushed application.
Practice: Practice: Your road map to accreditation · 3 questions
Frequently asked questions
About ISO/IEC 17025:2017 Implementation Training, its certificate and enrolment.
Ask SterlingYes. Sterling Academy's ISO/IEC 17025 courses are built by the Sterling consulting group, which has taken organisations to certification across 8,100+ client engagements in 60+ countries over 20+ years. They cover the awareness, implementation, internal auditor and specialist levels, always on the current edition, with practice questions that show the right answer. Each course ends with a final exam and a verifiable certificate that anyone can check online, plus a LinkedIn badge, and client administrators can show an auditor exactly who has been trained. You will be able to implement the ISO/IEC 17025 management system and face the certification audit with confidence. Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.
Awareness: ISO/IEC 17025 Awareness · Implementation: ISO/IEC 17025:2017 Implementation Training · Internal auditor: ISO/IEC 17025:2017 Internal Auditor Training · Specialist: Method Validation and Verification (ISO/IEC 17025:2017)
It is for laboratory quality managers leading accreditation, technical managers who own methods and equipment, laboratory owners and directors, and quality staff in testing and calibration laboratories. It suits organisations preparing for their first certification or accreditation and those rebuilding an existing system. Learners new to ISO/IEC 17025 may start with Sterling Academy's ISO/IEC 17025 awareness course.
It covers how to put a laboratory management system in place, clause by clause: ISO/IEC 17025:2017, the language of the laboratory and the route to accreditation; general and structural requirements: impartiality, confidentiality, legal entity and management; resources: personnel, facilities, equipment, metrological traceability and external providers; process requirements: requests and contracts, methods, verification and validation, sampling and handling items; technical records, measurement uncertainty, ensuring the validity of results and reporting; complaints, nonconforming work and control of data and information; management system requirements: Options A and B, documents, records, risks, audits and reviews; the procedures and records you need, and your road map to accreditation.
The course has 26 video modules and about 6 hours of video, with practice exercises after key modules and a final exam. Video runtimes are approximate, so allow additional time for the exercises and the exam. With 12 months of access, you can complete it in one sitting or spread it over several sessions.
Yes. Learners who score at least 60% in the final exam receive a Sterling Academy Certificate of Competence for ISO/IEC 17025:2017 Implementation Training. The written exercises are practice with feedback and do not count toward the result. A learner who does not reach the pass mark has one retake, which opens 24 hours after the result; a learner who finishes the course but does not reach it on the retake receives a Certificate of Completion. Each certificate carries a unique number and a QR code, and anyone can check it online.
Yes. ISO/IEC 17025:2017 Implementation Training is a self-paced online course made of short video modules, in English with captions. You study at your own pace during 12 months of access, and practice exercises with feedback help you apply each requirement to your own organisation. If a point is unclear, questions are answered by a Sterling consultant.
ISO/IEC 17025:2017 Implementation Training has a list price of US$149 per learner, with a limited-time offer of US$99 per learner until 31 December 2026. Teams save 20% for 11 to 50 learners and 30% for 51 to 200; 201 or more learners are priced on request. Client administrators can track their team's progress. Prices are in US dollars, excluding taxes, and Sterling confirms final pricing and enrolment.
It gives your people the knowledge ISO/IEC 17025 asks of them, and each learner's verifiable certificate is evidence of that training when the auditor asks. The course gives you the knowledge to implement ISO/IEC 17025 in your organisation; the certificate is a training certificate for the individual learner. Sterling's expert and experienced consultants can support your implementation from gap assessment to readiness.
Learning path
Start here
Build awareness of laboratory competence, impartiality and consistent operation, and the responsibilities that support confidence in testing and calibration.
View courseThis course
Put every ISO/IEC 17025:2017 requirement in place in your laboratory, from impartiality and competent people to traceable results, valid methods and accreditation readiness.
Your certificate
You will be able to implement the ISO/IEC 17025 management system and face the certification audit with confidence. Your certificate can be verified online in seconds, so certification body auditors, employers and clients can confirm your training instantly.
Reach the pass mark in the final exam and you receive a Sterling Academy Certificate of Competence, verifiable online by QR code, with a LinkedIn badge to share. Employers, clients and auditors can check it in seconds. Every learner who finishes the course receives a certificate: a Certificate of Completion when the retake does not reach the pass mark.
Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.
Ask about course requirementsYour next step
Not sure which course?