The training is a practitioner course for internal auditors of service management systems: what ISO/IEC 20000-1:2018 requires, clause by clause, and how to plan, conduct, report and follow up an internal audit using ISO 19011:2026 guidance. It covers auditing the service management plan, the service portfolio, service levels and suppliers, change and release, incidents and problems, availability, continuity and information security. A managed IT service provider in Singapore runs through the course.
Secure payment by Stripe · for yourself or for your team
What you get
About 6 hours, with captions. Watch at your own pace on any device.
Short questions check your understanding before you move on.
Score at least 60% to receive the Certificate of Competence.
Industry experts, domain specialist trainers and globally renowned auditors with 30+ years in ISO and GRC.

Verifiable certificate with a QR code anyone can scan, plus a digital badge to add to your LinkedIn profile.
See how verification works →Standard and editionISO/IEC 20000-1:2018
Last updated5 November 2026
Preview this course
Watch a sample from ISO/IEC 20000-1:2018 Internal Auditor Training before you enrol.
Learning outcomes
Connect the subject to the responsibilities and decisions people encounter in their roles.
Part of: ISO 20000 IT Service Management Training
Part of: Information Security & Privacy
Inside the course
25 modules, 25 practice checkpoints and a final exam. Video runtimes are approximate; allow additional time for the practice questions and the final exam. Modules marked optional can be skipped; the others are studied in any order.
Uses the CrowdStrike, AT&T and NATS outages to show what an ISO/IEC 20000-1 internal auditor asks about releases, changes and major incidents.
Opens with a self-assessment of your service management knowledge, then walks through three real outages: the July 2024 CrowdStrike Falcon update that Microsoft estimated affected about 8.5 million Windows devices, the February 2024 AT&T mobile outage where the FCC reported more than 92 million blocked calls after a misconfigured network element, and the August 2023 NATS flight planning failure that affected more than 700,000 passengers. Turns each into audit questions on release, change and major incidents. Introduces Kestrel IT Services, a worked example of a managed IT service provider in Singapore with about 650 staff and three services in scope. Contrasts two auditors of change management, explains clause 9.2, the scope of ISO/IEC 20000-1:2018 and its 2024 amendment, the definition of a service, and the clause 1.2 rule on other parties, then sets out the course structure, exam and four study habits.
What you will be able to do
Why it matters
Shows IT service managers and new auditors why evidence-based internal audits find release, change and incident weaknesses before an outage does.
Practice: Practice: Welcome: why service management audits matter · 3 questions
Explains the ISO/IEC 20000 family, how Part 1 is built, the seven clause 8 process groups, key terms, the no-exclusions rule and the 2024 climate amendment.
Starts with a new auditor at Kestrel IT Services demanding a documented capacity plan that the 2018 edition no longer requires. Introduces Parts 1, 2, 3, 5 and 10 of the series. Maps clauses 4 to 10 to the high level structure and walks through the seven groups of clause 8, from operational planning to service assurance. Explains that organisations may combine requirements into their own processes but cannot exclude any, using a London hospital IT department that does not charge for services. Defines service component, configuration item, asset, service catalogue, incident, problem, known error, service request, customer, user, internal and external supplier, request for change, release, SLA and service requirements. Covers the climate change points of Amendment 1 of 2024, five documents removed in 2018, how the standard relates to ITIL, and an exercise classifying a Mumbai bank's record.
What you will be able to do
Why it matters
Stops auditors raising findings from old checklists or misread terms, so every nonconformity rests on a real ISO/IEC 20000-1:2018 requirement.
Practice: Practice: The standard through an auditor's eyes · 3 questions
Applies ISO/IEC 20000-5 implementation guidance so auditors know what evidence to expect at each stage and maturity level of an SMS.
Begins with an auditor at Kestrel IT Services, eight months into its system, finding incident management working but capacity, budgeting and demand barely started. Introduces ISO/IEC 20000-5 and its typical steps: initiation, planning, implementation, evaluation and future action. Explains why the auditor reads the business case and how to run a baseline assessment or gap analysis as a real audit. Covers the two phasing approaches, starting with resolution and fulfilment, the risk of silos and the need to define interfaces between live and unfinished processes. Walks through the three maturity levels and Table 1, including how internal audit itself looks at each level, with a Sydney university IT team as a Level II example. Shows why a strong finding names a Part 1 requirement rather than a maturity level, gives four practical audit moves, contrasts a long-certified Dubai airline IT division, and ends with an exercise.
What you will be able to do
Why it matters
Helps auditors read a young or mature system in context, test the handovers where risks sit, and give management a report useful for planning.
Practice: Practice: What to expect at each stage · 3 questions
Sets out clause 9.2 audit requirements, ISO 19011:2026 guidance, evidence and findings, audit types and roles, and the seven principles of auditing.
Opens with Kestrel IT Services' change manager auditing his own process for three years and reporting no findings while unapproved emergency changes continue. Walks through clause 9.2.1 and 9.2.2: audits at planned intervals, an audit programme that considers process importance, changes and previous results, and the duties on criteria, impartiality, reporting and records. Introduces ISO 19011:2026, the fourth edition published in May 2026, with its expanded remote auditing guidance. Defines an audit, objective evidence and the three sources of evidence, shown through major incident reviews where interviews, records and the ticket tool disagree. Builds the chain of criteria, evidence, finding and conclusion, then covers first, second and third-party audits, audit roles, programme, scope and plan, and combined, joint and remote audits. Explains the seven principles with Kestrel examples, cross-auditing for independence, a New York payments firm with one IT manager, and a canteen-rumour exercise.
What you will be able to do
Why it matters
Gives internal auditors the method and independence that make management trust their reports, so audits find problems instead of confirming them.
Practice: Practice: Internal audit, terms and principles · 3 questions
Clause 4 in audit practice: context issues, the climate change decision, interested parties, the SMS scope and how processes interact.
Begins with a Managed Backup service that appears on two bank clients' invoices at Kestrel IT Services but not in the scope statement. Explains clause 4.1 issues with four Kestrel examples, and the 2024 amendment's decision on whether climate change is relevant. Covers clause 4.2 interested parties and their requirements, then clause 4.3 scope, comparing a weak and a strong scope statement and reading scope where a public cloud provider operates components. Explains clause 4.4 and why the auditor follows one handover from problem to change, release and configuration record. A London hospital IT department shows that internal customers and suppliers count. Sets out what to expect at each Part 5 maturity level, the auditor's questions and evidence, the test of comparing scope with the catalogue and invoices, two worked findings including an unrecorded Singapore data location requirement, and a Toronto exercise.
What you will be able to do
Why it matters
Helps auditors confirm that the SMS covers the services actually delivered and the requirements customers actually set, the base for every other question.
Practice: Practice: Context, parties, scope and the SMS · 3 questions
Tests top management against clause 5: the twelve leadership duties, defining value, the policy, assigned roles and short leadership interviews.
Opens with three people at Kestrel IT Services giving three different answers on who may approve an emergency change at two in the morning. Walks through the twelve clause 5.1 duties in three groups, including the plan, levels of authority, value and control of other parties. Explains the definition of value and how to compare what leaders say customers value with objectives and targets. Covers the clause 5.2 policy and its two commitments, contrasting a weak and a strong policy, and the clause 5.3 roles of ensuring conformity and reporting performance, shown in Kestrel's revised roles. Gives four habits for interviewing top management and an example of six months of IT committee minutes at a Mumbai bank. Covers Part 5 maturity, the questions and evidence to seek, two worked findings on emergency change authority and a vacant SMS manager role, and a Hong Kong policy exercise.
What you will be able to do
Why it matters
Lets auditors test whether leaders truly run the SMS, finding gaps in authority and reporting that cause confusion during real incidents.
Practice: Practice: Leadership, policy and roles · 3 questions
Audits clause 6.1 risks from three sources with customer impact and acceptance criteria, and clause 6.2 measurable objectives and their plans.
Starts with Kestrel IT Services' forty-risk register that omits the public cloud provider hosting all three services. Covers clause 6.1.1 and the more specific clause 6.1.2, which requires documented risks related to the organisation, not meeting service requirements and other parties, their impact on customers, risk acceptance criteria and the approach to risk. Gives one risk from each source and an opportunity, shows how customer impact changes priority, and explains how to sample accepted high risks. Covers clause 6.1.3 actions, the options for treating risk and ISO 31000, and how a risk should travel into continuity plans, supplier contracts and management review. A Frankfurt logistics company's unfunded server replacement shows a rated but unaddressed risk. Explains clause 6.2 measurable objectives, SMART wording, a cascade from 99.95 per cent availability to team targets and the five planning answers, then maturity, evidence, a worked finding and a New York exercise.
What you will be able to do
Why it matters
Helps auditors find the risks that would hit customers hardest, such as supplier failure, and objectives that cannot be measured or achieved.
Practice: Practice: Risks, opportunities and objectives · 3 questions
Checks the clause 6.3 service management plan and its eight items, then clause 7.1 to 7.4 resources, competence, awareness and communication.
Opens with Kestrel IT Services' service management plan, sound but two years old, while a second cloud region, a new ticket tool and a departed service management lead go unrecorded. Explains clause 6.3: create, implement and maintain the plan, what planning must consider, alignment of other plans, and the eight items it must include or reference, from known limitations to technology and measurement. Compares the old plan with reality and a continuity plan still listing a retired service. Covers clause 7.1 human, technical, information and financial resources, and clause 7.2 competence for everyone under the organisation's control, using Kestrel's change approvers. Explains the five clause 7.3 awareness points and how to test them through the job, and clause 7.4 communication, recalling the NATS review. A Toronto retailer's contractor engineers show competence still applies. Ends with maturity, auditor questions, evidence, a worked finding and a Mumbai service desk exercise.
What you will be able to do
Why it matters
Gives auditors a fast test of whether the SMS is alive, by checking the plan and the people against how services really run today.
Practice: Practice: The plan, resources and people · 3 questions
Covers clause 7.5 documented information, the clause 7.5.4 key documents list, records held in tools, and clause 7.6 knowledge.
Opens in Kestrel IT Services' network operations centre, where a night engineer restores a database from an obsolete runbook saved on his laptop. Explains the two kinds of documented information in clause 7.5.1 and walks through the clause 7.5.4 list of key documents, from scope and policy to SLAs, supplier contracts, required procedures and records. Covers clause 7.5.2 identification, format and approval, the clause 7.5.3 controls, external documents and document change control. Distinguishes documents from records and shows how to audit records held in ticket and change tools: silent edits, retention and tool migrations. Lists records that clause 8 names process by process, and checks protection of sensitive ticket data that every agent can read. Explains clause 7.6 knowledge, with a Sydney university whose only exam-system engineer left. Ends with maturity, auditor questions, evidence, two worked findings including a missing major incident procedure, and a London exercise.
What you will be able to do
Why it matters
Helps auditors find obsolete procedures, unprotected tickets and knowledge held by one person before they cause a failed restore or a long outage.
Practice: Practice: Documents and knowledge · 3 questions
Focuses on clause 8.1 operational control, planning the services under 8.2.2 and the accountability and control of other parties in 8.2.3.
Begins with a five-hour bank database outage that Kestrel IT Services' hosting manager blames on the cloud provider, though the bank's contract is with Kestrel. Covers clause 8.1: performance criteria for each process, with four Kestrel examples, documented information for confidence, planned and unintended changes to the SMS, and control of outsourced processes. Explains the service portfolio in clause 8.2.1 and clause 8.2.2 planning: documented service requirements, criticality, dependencies and duplication, shown by a service desk tool that ran on the platform it supported. Sets out clause 8.2.3.1: retained accountability, selection criteria, the documented list of what other parties provide or operate, and integration. Covers the two kinds of control in clause 8.2.3.2 and the clause 1.2 limit on reliance. A Dubai airline's lowest-bid network supplier shows missing selection criteria. Ends with maturity, auditor questions, evidence, a worked finding on an unmeasured monitoring partner and a Mumbai exercise.
What you will be able to do
Why it matters
Prepares auditors to test that the organisation stays accountable for outsourced service components and measures what suppliers actually deliver.
Practice: Practice: Operation, planning and other parties · 3 questions
Service catalogue, asset and configuration management under clauses 8.2.4 to 8.2.6, including testing records against the live environment.
Starts with Kestrel IT Services' configuration records listing 1,200 hosting servers while the cloud console shows 1,370. Explains clause 8.2.4: catalogues that describe services, intended outcomes and dependencies and checking the customer view. Covers clause 8.2.5 asset management against clause 6.3 obligations, with four Kestrel assets from database licences to secure disk destruction. Sets out clause 8.2.6: defined CI types, services as CIs, the five items recorded for each CI, detail matched to criticality, traceable changes, updates after deployment and verification at planned intervals. Shows how records drift when engineers create servers outside change management, why the auditor tests in both directions, and why relationships between items matter for incidents and changes. A Hong Kong insurer with 640 accounts on a 500-user licence shows a quick asset test. Covers baselines before release, maturity, evidence, two worked findings and a Sydney catalogue exercise.
What you will be able to do
Why it matters
Lets auditors expose unknown servers, licence overuse and missing catalogue entries that slow incident response and create contract and cost risk.
Practice: Practice: Catalogue, assets and configuration · 3 questions
Business relationship and service level management under clauses 8.3.2 and 8.3.3, from complaints and surveys to SLA targets and workload limits.
Opens with Kestrel IT Services' largest bank client, green on every target yet inviting other providers to bid. Explains clause 8.3.1 and how business relationship, service level and supplier management fit together. Covers clause 8.3.2: documented customers and users, named relationship owners, communication about the customer's evolving business, reviews of trends and outcomes, satisfaction measured on a representative sample, and complaints managed to closure with escalation. Shows a 96 per cent survey that only asked users with closed tickets, and traces a complaint about overly technical reports. Covers clause 8.3.3: agreeing services, SLAs with targets, workload limits and exceptions, the hosting SLA at 99.95 per cent in trading hours, and monitoring workload against limits. Describes a quarterly business review, compares weak and strong service reports under clause 9.4, and uses a London hospital's repeated missed target. Ends with maturity, questions, evidence, two worked findings and a Toronto exercise.
What you will be able to do
Why it matters
Helps auditors spot a customer relationship at risk even when targets are green, before the organisation loses a contract it thought was safe.
Practice: Practice: Relationships and service levels · 3 questions
Supplier management under clause 8.3.4: contracts, alignment with customer SLAs, monitoring, contract review, disputes and internal suppliers.
Begins with Kestrel IT Services' four-hour restore promise to a bank while its data-centre operator's contract allows an eight-hour response. Explains clause 8.3.4.1: designated supplier managers, a documented contract with scope, requirements, targets and authorities, checked against Kestrel's public cloud agreement. Covers the requirement to assess supplier targets against customer SLAs and manage the risk, defined interfaces, monitoring at planned intervals, contract review against current requirements, impact assessment of contract changes and disputes managed to closure. Shows why the organisation checks the supplier's 99.995 per cent figure against its own monitoring, and rejects a cheaper support tier that would break two bank SLAs. Covers clause 8.3.4.2 agreements with internal suppliers and a bank acting as a supplier through its sign-in platform. A London retailer's unmanaged payment gateway contract, a monthly cloud supplier review, maturity, evidence, two worked findings and a Sydney exercise complete the module.
What you will be able to do
Why it matters
Helps auditors find supplier contracts that cannot support customer promises, so one supplier outage does not become a broken SLA.
Practice: Practice: Supplier management · 3 questions
Budgeting and accounting, demand forecasting and capacity planning under clause 8.4, including thresholds and timescales for adding capacity.
Opens with Kestrel IT Services' hosting storage filling at month-end after six weeks at 85 per cent, failing two banks' batch jobs, while a bank had already told its account manager its data would double. Covers clause 8.4.1 budgeting and accounting per service with Kestrel's hosting budget 18 per cent over on cloud costs, and compares weak and strong financial control. Explains clause 8.4.2 demand management and four places future demand hides: customer plans, the portfolio, trends and seasonal peaks. Covers clause 8.4.3 capacity for human, technical, information and financial resources, planning that includes forecast capacity, the impact of SLAs and continuity, and thresholds and timescales such as ordering storage at 75 per cent. Links rising cloud costs to unrecorded servers and uses a Frankfurt logistics service desk understaffed for holiday peaks. Ends with maturity, evidence, two linked findings and a Toronto exercise.
What you will be able to do
Why it matters
Prepares auditors to spot capacity and cost risks early, so known customer growth turns into capacity before a month-end failure.
Practice: Practice: Budgeting, demand and capacity · 3 questions
Change management under clause 8.5.1: the policy and emergency changes, decisions, back-out plans, tracing from logs and trend analysis.
Opens with a Friday-night firewall change at Kestrel IT Services that took a bank's mobile app offline with no request, approval or back-out plan. Explains clause 8.5.1.1: a documented change policy defining items under control, categories including emergency change, and criteria for major impact, with Kestrel's revised standard, normal and emergency categories. Covers clause 8.5.1.2 initiation and when changes must go through service design and transition. Walks through clause 8.5.1.3: decisions considering risks, benefits and impacts, preparation and testing, communication, back-out planning, investigation of failed changes, effectiveness reviews and trend analysis. Explains why emergency changes are sampled first and why the auditor traces from firewall and server logs back to approvals. A trend analysis on Friday network changes and a Toronto retailer's failed checkout upgrade lead to maturity, evidence, a worked finding and a Hong Kong exercise.
What you will be able to do
Why it matters
Lets auditors find unapproved and emergency changes before they cause the next outage, one of the most common sources of service failure.
Practice: Practice: Change management · 3 questions
Service design and transition under clause 8.5.2 and release under 8.5.3, from acceptance criteria to baselines and post-release incidents.
Begins with Kestrel IT Services' Managed Backup service, which went live without acceptance criteria or a tested restore, and whose first real restore took nine hours. Covers the eight planning items in clause 8.5.2.1, including acceptance criteria and measurable intended outcomes, plus planning for services that are removed or transferred. Explains the design contents in clause 8.5.2.2 and build and transition in clause 8.5.2.3, with recorded decisions when criteria are not met and reports on outcomes. Sets out clause 8.5.3: defined release types including emergency release, deployment planned with change management, verification against criteria, a baseline of configuration items and monitoring of post-release incidents. Revisits the CrowdStrike update, staged deployment and Kestrel's finding that a quarter of successful releases caused incidents. A New York payments firm's missing knowledge transfer leads to maturity, evidence, a worked finding and a Hong Kong exercise.
What you will be able to do
Why it matters
Helps auditors stop new services and releases going live untested, reducing the risk of a failed launch or a release that breaks customers' services.
Practice: Practice: Design, transition and release · 3 questions
Incident, service request and problem management under clause 8.6, including major incidents, access requests, root causes and known errors.
Starts with forty identical Monday-morning incidents at Kestrel IT Services, each restored within target but never linked to a problem record. Explains clause 8.6.1: incidents recorded, classified, prioritised by impact and urgency, escalated, resolved and closed, with records updated with actions. Covers major incident criteria, the documented procedure, informing top management, ownership and post-incident review, with a timed Kestrel storage incident and lessons from the November 2024 NATS review. Sets out clause 8.6.2 service request management and why access requests need the data owner's approval and instructions people can find. Explains clause 8.6.3: analysing incident trends, root cause analysis, changes through change management, known errors shared with the service desk, and reviewing effectiveness, following the Monday chain to closure. A Sydney university's problems closed without causes leads to maturity, evidence, two worked findings including unreviewed major incidents, and a Dubai exercise.
What you will be able to do
Why it matters
Prepares auditors to find repeat incidents nobody investigates and major incidents nobody reviews, so the same failures stop recurring.
Practice: Practice: Incidents, requests and problems · 3 questions
Service assurance under clause 8.7: availability targets, continuity plans and their testing, and information security management.
Opens with Kestrel IT Services' forty-page hosting continuity plan, never tested, with its contact list stored only on the office file server. Covers clause 8.7.1: assessing availability risks, documented requirements and targets, monitoring against them and investigating unplanned non-availability, and why availability measured from the users' side during trading hours beats a server figure. Explains clause 8.7.2: continuity risks and requirements, plans with five items including returning to normal, access to the plan and contacts when the normal location is unavailable, testing, re-testing after major change, and reports after real invocation. A Dubai airline's quiet Sunday failover test shows a test that does not prove the requirement. Covers clause 8.7.3 information security policy, risk assessment, documented control decisions, external organisations, and security incidents analysed by impact, and how to use an existing ISO/IEC 27001 system. Ends with maturity, evidence, a worked finding and a Mumbai exercise.
What you will be able to do
Why it matters
Helps auditors prove that continuity plans would work in a real disruption and that availability figures reflect what customers actually experience.
Practice: Practice: Availability, continuity and security · 3 questions
Audits clause 9 evaluation and clause 10 improvement, from valid measures and the audit process itself to management review decisions.
Begins with two twelve-page management review minutes at Kestrel IT Services that report every input but record no decision. Explains clause 9.1: what to monitor, valid methods, timing, analysis and the two evaluations, shown by a 92 per cent first-call resolution figure that falls to 74 per cent once reopened tickets are counted. Covers how to audit clause 9.2 itself, where Kestrel's programme ignored a new cloud region, a new ticket tool and Managed Backup. Walks through the twelve clause 9.3 inputs and the required outputs, with Kestrel's revised review recording three owned decisions. Explains clause 9.4 service reporting with trends and actions. Covers clause 10.1 nonconformity and corrective action, the difference between correction and corrective action, and clause 10.2 evaluation criteria, targets and measurement for improvements, with a Toronto retailer's thirty unmeasured improvements. Ends with maturity, evidence, a worked finding and a Hong Kong exercise.
What you will be able to do
Why it matters
Lets auditors turn management review into a place where decisions are made, and confirm corrective actions and improvements actually work.
Practice: Practice: Evaluation and improvement · 3 questions
Plans a risk-based audit programme under clause 9.2.2 and ISO 19011:2026, then one audit's objectives, scope, criteria, plan and checklist.
Opens with Kestrel IT Services' one-line audit plan that never reached change management before a firewall change took a bank offline. Places planning in Figure 1 of ISO 19011:2026, the audit programme cycle and the steps of a single audit. Revisits clause 9.2.2 and shows how importance, changes and previous results set priorities while every clause is still covered. Builds an example programme grid for Kestrel and adjusts it when a second cloud region raises failed changes. Covers selecting impartial and competent auditors, then defining objectives, scope, and criteria with clause titles, using a hosting change audit and a London hospital major incident audit. Sets out a one-day audit plan, choosing on-site or remote methods, preparation sources, four checklist types including a risk and SLA based checklist, a four-column format, and weak and strong checklist lines. Ends with a night-shift planning exercise and four common mistakes.
What you will be able to do
Why it matters
Helps auditors spend audit time where failures are most likely, so the audit finds the change or incident weakness before customers feel it.
Practice: Practice: Planning the audit programme to checklist · 3 questions
Conducting the audit, part one: the opening meeting, behaviour on site, guides, remote auditing methods and the human side of auditing.
Opens in Kestrel IT Services' network operations centre, where an auditor skips the opening meeting, takes an engineer's keyboard and changes a live monitoring filter. Explains the three purposes of the opening meeting in clause 6.4.3 of ISO 19011:2026 and the eight points to confirm with a short version for small audits and a ten-minute Kestrel example. Covers on-site advice from Annex A: keep the site's rules, avoid disturbance and never touch equipment or live consoles, plus screenshots and the role of guides. Explains Table A.1 remote and on-site methods, four rules for remote auditing and a remote change record session with a tested plan B. Describes the qualities of a good auditor, five traits of a bad one, ten habits and two interviews of the same night-shift engineer, then two exercises on guides and borrowed logins.
What you will be able to do
Why it matters
Helps internal auditors earn the trust that makes engineers share what really happens, without disturbing live operations during the audit.
Practice: Practice: Conducting the audit, I opening, site, people · 3 questions
Conducting the audit, part two: verifying information, sampling, open questions, note taking and following one service end to end.
Explains investigating to the depth necessary, following a trail from a May storage outage to its change record and five more changes. Walks through Figure 2 of ISO 19011:2026, from sources of information through sampling and verification to findings and conclusions. Sets out the four checks of complete, correct, consistent and current, and applies them in a Frankfurt logistics company where a late patch turns out to be explained. Compares judgement-based and statistical sampling and the risk that samples are not representative. Covers open, closed, leading and appreciative questions, the tell me and show me technique, and talking to engineers, customers and suppliers. Shows what a good note holds, then follows Managed Cloud Hosting at Kestrel IT Services through nine clauses, from clause 6.1 risk to clause 9.3 management review. Adds guidance on context, leadership, risk and compliance, a defensible hosting sample and two exercises.
What you will be able to do
Why it matters
Gives auditors findings that stand up at the closing meeting because every one rests on verified evidence, a recorded sample and clear notes.
Practice: Practice: Conducting the audit, II evidence, one service · 3 questions
Generating and grading findings, writing four-part nonconformity statements, the closing meeting, the audit report and verifying corrective actions.
Explains sharing findings with the auditee as you go and reviewing each nonconformity before the closing meeting, as clause 6.4.8 of ISO 19011:2026 describes, seeking acknowledgement of the evidence rather than acceptance of the finding. Covers generating findings and the guidance on grading, then Sterling's major and minor grading criteria, applied to Kestrel IT Services examples. Distinguishes opportunities for improvement and good practice, and four nonconformities that will not stand. Sets out the four parts of a nonconformity from Annex A, with worked statements on approver training under clause 7.2 and emergency change under clause 8.5.1.1, and weak and strong statements side by side. Covers the closing meeting in clause 6.4.10, the report contents in clause 6.5.1, the auditee's clause 10.1 response, a four-part nonconformity report form, reviewing a weak and a strong response, four ways follow-up fails, and an engineer error exercise.
What you will be able to do
Why it matters
Gives auditors findings that management acts on and follow-up that closes on evidence, so audit results lead to lasting fixes, not promises.
Practice: Practice: Findings, closing and follow-up · 3 questions
Sets out the evidence an ISO/IEC 20000-1 auditor asks for, function by function, from top management and suppliers to change, the service desk and HR.
Starts with a new auditor who asks Kestrel IT Services for all its documents and receives two thousand files. Begins with one request for the key documents of clause 7.5.4, then gives targeted requests and a typical finding for each function: top management and value, the SMS manager's risks and audit programme, service owners and relationship managers, the service level manager's SLAs and workload, and the supplier manager's list of outsourced components and contract alignment. Continues with change and release logs and baselines, configuration and asset records tested in both directions, the service desk and problem management, capacity, demand and finance, service assurance, and HR competence records including contractors. Shows the one-page request sent before Kestrel's change audit. Covers using all three sources of evidence, pulling records live from tools instead of prepared spreadsheets, four red flags, and a Dubai exercise.
What you will be able to do
Why it matters
Lets auditors arrive prepared with a short, targeted request, saving the auditee's time and spending the audit day on sampled records.
Practice: Practice: The evidence, function by function · 3 questions
Brings the course together: six steps of an effective audit, a mock incident and problem audit at Kestrel IT Services, takeaways and the final exam.
Walks through six steps of an effective internal audit: start from ISO/IEC 20000-1 requirements before procedures, understand the setting, check documents against the work, test risks, objectives and awareness, review controls, changes and results, and close properly with follow-up. Follows a mock audit of incident and problem management at Kestrel IT Services by the supplier manager, independent of the area: the opening meeting, counting six major incidents against four reviews, forty identical Monday incidents with no problem record. Shows her two four-part nonconformities, one minor and one major, the closing meeting, the report two days later, the root cause, and closure on evidence after sixty days. Draws out four habits, four places audits go wrong and five takeaways, adds a quick check, an opportunity for improvement and a good practice, then describes the thirty-question final exam and how to start a first internal audit.
What you will be able to do
Why it matters
Prepares learners to plan, conduct and report internal audits of their own SMS as clause 9.2 requires, with results that keep services reliable.
Practice: Practice: An effective audit, end to end · 3 questions
Frequently asked questions
About ISO/IEC 20000-1:2018 Internal Auditor Training, its certificate and enrolment.
Ask SterlingYes. Sterling Academy's ISO/IEC 20000-1 courses are built by the Sterling consulting group, which has taken organisations to certification across 8,100+ client engagements in 60+ countries over 20+ years. They cover the awareness and internal auditor levels, always on the current edition, with practice questions that show the right answer. Each course ends with a final exam and a verifiable certificate that anyone can check online, plus a LinkedIn badge, and client administrators can show an auditor exactly who has been trained. You will be able to plan and conduct internal audits of your ISO/IEC 20000-1 management system, and face the certification audit with confidence. Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.
Awareness: ISO/IEC 20000-1 IT Service Management Awareness · Internal auditor: ISO/IEC 20000-1:2018 Internal Auditor Training
It is for service delivery and service desk managers, change, problem and release managers, supplier and service level managers, IT operations and quality staff, and anyone appointed to audit an ISO/IEC 20000-1 service management system. It suits managed service providers, in-house IT departments and shared service centres. Learners new to the standard may begin with our ISO/IEC 20000-1 awareness course.
It covers every clause of ISO/IEC 20000-1:2018, including the service portfolio, service levels, suppliers, change and release, incidents and problems, and service assurance, plus how to plan, conduct and report an internal audit following ISO 19011:2026. You also learn what to expect at each stage of implementation, using ISO/IEC 20000-5, and practise with audit scenarios in every module.
Practice questions after each module let you test each audit skill, as practice only. The course ends with a scenario-based multiple-choice final exam. Learners who score 60% or more receive a Sterling Academy Certificate of Competence, and one retake is included. Each certificate carries a unique number and a QR code, so anyone can check it online.
You will be able to plan, conduct and report internal audits of your own organisation's service management system, as clause 9.2 of ISO/IEC 20000-1:2018 requires: build a risk-based programme, prepare checklists, sample tickets and change records, write clear nonconformities and verify corrective action. Your organisation decides who audits internally; certification is granted by an independent certification body after its own audit.
The course is in preparation. Register on this page with “Notify me when it launches” and we will send you one e-mail when it opens for enrolment, with the price per learner and the details for team enrolment. The course page will then show the full module list and the video runtime.
Your certificate
You will be able to plan and conduct internal audits of your ISO/IEC 20000-1 management system, and face the certification audit with confidence. Your certificate can be verified online in seconds, so certification body auditors, employers and clients can confirm your training instantly.
Reach the pass mark in the final exam and you receive a Sterling Academy Certificate of Competence, verifiable online by QR code, with a LinkedIn badge to share. Employers, clients and auditors can check it in seconds. Every learner who finishes the course receives a certificate: a Certificate of Completion when the retake does not reach the pass mark.
Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.
Ask about course requirementsYour next step
Not sure which course?