Online training course to keep contractors and high-risk work under control from planning to hand-back.
This awareness training course explains how to manage contractors and control high-risk work under ISO 45001:2018 clause 8.1.4.2 and the UK HSE guides HSG159 and HSG250: planning the job, choosing contractors on safety criteria, induction and supervision on site, when a permit to work is needed, the roles in a permit system, the permit form, isolations, display, suspension, shift handover and hand-back, and monitoring and audit. A fuel storage terminal in Singapore runs through the course, with construction and facilities examples.
Secure payment by Stripe · for yourself or for your team
Add another course and save 15%, up to 25%
What you get
About 108 minutes, with captions. Watch at your own pace on any device.
Short questions check your understanding before you move on.
Multiple choice, with one retake if you need it.
Industry experts, domain specialist trainers and globally renowned auditors with 30+ years in ISO and GRC.

Verifiable certificate with a QR code anyone can scan, plus a digital badge to add to your LinkedIn profile.
See how verification works →Save when you take more than one course
The discount is added automatically in your basket.
Standard and editionISO 45001:2018; HSE HSG250 and HSG159
Last updated9 November 2026
Preview this course
Watch a sample from Contractor Safety and Permit to Work Training before you enrol.
What learners say
Every course is built by the experts behind 8,100+ client engagements in 60+ countries, so you learn what auditors and regulators actually expect. Here is what professionals said after finishing their course.
Informative
10/10 for Philippines Data Privacy Act and DPO Training
Best value
All-Access Pass
A pharma and life sciences professional from the USA started with one course, then upgraded to the All-Access Pass.
Every Sterling Academy course for 12 months.
US$499
See the passA selection of comments from learners who finished a course and answered our feedback request, shortened from their own words. Client names available on request.
Learning outcomes
Connect the subject to the responsibilities and decisions people encounter in their roles.
Inside the course
10 modules, 10 practice checkpoints and a final exam. Video runtimes are approximate; allow additional time for the practice questions and the final exam. Modules marked optional can be skipped; the others are studied in any order.
Shows why contractor control and permits to work matter through four cases, from a roof fire during hot work to the Piper Alpha handover.
Opens the Contractor Safety and Permit to Work training course with four cases: a 2024 roof fire where welding went ahead with no permit, scald injuries during steam pipework maintenance without isolation, a platform collapse where two contractors did not coordinate, and the permit failures at Piper Alpha in 1988. Draws four lessons, including that using contractors does not remove the organisation's responsibility under ISO 45001. Introduces LTK Energy Terminals Limited, a fuel storage terminal in Singapore, where a contract fitter was splashed with diesel because two permits on connected lines were not linked. Outlines the ten modules and three myths about permits.
What you will be able to do
Why it matters
Procedures that nobody makes sure are used protect nobody, so controlling contractors and permits is what keeps high-risk work safe.
Practice: Practice: Why contractor control matters · 3 questions
Reads what ISO 45001 requires for contractors and procurement in plain words, with its guidance and the ILO guidelines.
Starts with a contract electrician at a hospital in Toronto, where he and the estates team each assumed the other was in control. Defines a contractor under clause 3.7, then covers procurement under clause 8.1.4.1 and clause 8.1.4.2: controlling risks in three directions, applying the organisation's system to contractors, and selecting contractors on health and safety criteria. Explains the Annex A tools for coordination and the checks of capability before work starts, multi-employer workplaces under clause 8.1.1, emergency information under 8.2, and outsourcing under 8.1.4.3. Adds the ILO guidelines, worker consultation under clause 5.4, an office refurbishment in London, and the gaps LTK found.
What you will be able to do
Why it matters
Contracts share the work but do not transfer the duty, so the boundary between your plant and a contractor's work is yours to manage.
Practice: Practice: What ISO 45001 requires · 3 questions
Covers planning a contractor job and choosing the contractor, using the first two of HSE's five steps for managing contractors.
Opens with a Friday afternoon pump failure at a chemical plant in Mumbai, where a fitter is called because he is known, available and cheap. Sets out the five steps of HSE's guide HSG159, then step one: define the job, identify hazards, reduce risks and set conditions, with the guide's corroded pipework example. Covers step two: asking about experience, policy and practice, competence and supervision, with evidence in proportion to the risk. Explains the catches in choosing on availability or price, controlling subcontractors, building preferred contractors, and agreeing the job in writing. Plans LTK's tank T-7 job and shows how it chose its cleaning contractor.
What you will be able to do
Why it matters
A contractor called in a hurry may not know your site's hazards, so choosing on evidence before you need someone avoids the quick fix.
Practice: Practice: Planning and choosing · 3 questions
Shows how to manage contractors on site: signing in, a named contact, the briefing, checking the job, keeping a check and reviewing it.
Starts with the HSG159 case of contractors who fell from a ladder while replacing lagging, on a job the company thought was finished. Covers step three: signing in and out, a named site contact, the briefing on hazards, rules and emergencies, and checking the job before work starts, with a cabling contractor at a data centre in Sydney. Explains step four, keeping a check in proportion to the risk, returning to planning when the job changes, and reporting hazards and incidents both ways. Covers step five, reviewing the work. Shows LTK's contractor gate, how it kept a check during the T-7 job, the right to stop work, and its review of the September event.
What you will be able to do
Why it matters
Changes, short cuts and new crews go unseen if contractors are pointed to the job and left alone, and a contractor on site stays your responsibility.
Practice: Practice: Contractors on site · 3 questions
Explains what a permit to work system is, what it is for, which jobs need one, and how it fits with task risk assessment.
Opens with a roofing contractor using a gas torch on an office tower in New York, near an air intake, with nobody aware the job had started. Gives the HSG250 definition of a permit to work system as a formal recorded process and a means of communication, and what a permit is not. Lists the objectives and essential features of a permit system, the four situations where permits suit, and examples such as hot work and confined space entry. Warns against permits for everything, and places the permit within task risk assessment. Uses HSG250 case studies, including the Hickson and Welch batch still in 1992, and the permits LTK needs for the T-7 job.
What you will be able to do
Why it matters
A permit for everything soon becomes a signature for nothing, while permits used for the right jobs make people think before high-risk work.
Practice: Practice: What a permit to work is · 3 questions
Sets out the roles in a permit to work system, what each person is responsible for, and the training and supervision they need.
Starts with a hotel in Dubai where a maintenance manager issued a hot work permit to himself. Describes the common titles HSG250 suggests: originator, permit authoriser, issuing authority, performing authority, permit user, area authority, site checker and isolating authority. Explains why issue and acceptance must stay separate, and the duties of the employer, the area authority, the issuer, contractors, supervisors and every individual, including stopping work when in doubt. Covers site visits by issuers, limiting each issuer's workload, and training and competence that are tested and recorded, with HSG250 case study thirteen. Names the roles for LTK's T-7 job.
What you will be able to do
Why it matters
Every signature on a permit should mean someone actually looked, which only happens when roles are clear and people have time to check.
Practice: Practice: Roles in a permit system · 3 questions
Explains what a permit form should contain, its design and colours, electronic permits, and the planning that comes before issue.
Opens with a vague permit for a lighting distribution board in an office building in Paris that nobody could use to check anything. Covers HSG250's advice on form design, then the thirteen essential elements of a permit form in its Figure 1, from title and reference to hand-back and cancellation, with signatures dated and timed. Explains the suggested colours in Table 2 and what to check before using electronic permits. Sets out the planning process in Figure 2: define, categorise, assess, decide and implement, rejecting tasks that cannot be done safely. Uses two HSG250 case studies, then shows LTK's red-edged hot work permit for the T-7 job and how it was issued.
What you will be able to do
Why it matters
A vague permit cannot be used to check anything, while a specific one shows exactly what was isolated, by whom and when.
Practice: Practice: The permit and its issue · 3 questions
Covers keeping a permit working once it is issued: display, suspension, interaction between jobs, shift handover and hand-back.
Starts with a sprinkler zone left isolated above a food court in a shopping centre in Hong Kong after a permit was suspended and filed in a drawer. Covers the five controls for permits in use: display, suspension, interaction, handover and hand-back, each with an HSG250 case study, including four from Piper Alpha and the missing safety valve. Explains that a suspended permit stays in force until cancelled, and that work restarts only when the issuer has verified it is safe. Adds a 2026 prosecution over scalding during steam pipework work, then returns to LTK's September event, where two unlinked permits led to the wrong valve being isolated, and the changes LTK made.
What you will be able to do
Why it matters
A permit controls the work only while people can see and use it, so display, links and handovers stop isolations being forgotten.
Practice: Practice: Permits in use · 3 questions
Shows how to monitor, audit and review a permit to work system so that it works at the job, not only on paper.
Opens with a hospital estate in Toronto whose monthly reports showed perfect permit forms, until a ladder fell through a ceiling during work limited to floor level. Sets the frame of ISO 45001 clause 9.1.1, then HSG250's four levels of checking, from issuer visits to a system review at least every three years. Covers the day-to-day checklist in Appendix 4, stopping work when conditions are unsafe, keeping permits at site for at least thirty days, and talking to permit users at the job. Explains early-warning and lagging indicators, audits under Appendix 3 and clause 9.2.1, and two cases where rules existed but were not used. Shows LTK's monitoring of the T-7 job and its four measures.
What you will be able to do
Why it matters
Perfect forms in the office can hide ignored conditions at the job, so checking the work itself is what gives early warning.
Practice: Practice: Monitoring and audit · 3 questions
Puts contractor control and permits to work together on a full tank job, then applies them on a construction site and in facilities.
Closes the training course by following LTK's tank T-7 job at its Singapore terminal from start to finish: planning, choosing three contractors, induction, task risk assessments and a linked set of four permits and certificates. Shows a normal day with a shift coordination meeting, then day three, when a rising gas reading and a change of wind lead the crew to stop and the permits to be suspended. Covers hand-back and the job review. Applies the same ideas to roof plant welding on an office tower in Sydney and a fire alarm isolation in an office tower in Dubai. Sets out each person's part, a one-page summary, five takeaways and the final exam.
What you will be able to do
Why it matters
Control means people checking the work every day, and a job run this way stops safely when conditions change.
Practice: Practice: Putting it together · 3 questions
About this course
Much of the most dangerous work on any site is done by people who do not work there every day: maintenance crews, cleaners, scaffolders and specialist trades. Recent cases from Britain's workplace regulator show what happens when that work is not controlled. In June 2024, four subcontractors escaped a roof fire started by welding sparks, through a single opening and down one ladder; the company had hot work rules, but no permit was issued. In a case sentenced in September 2026, an employee and a contractor were scalded while changing a gasket on steam pipework, because isolation and lock-off were not used. On a refurbishment project, a loaded temporary platform fell on a subcontractor drilling below. The older lessons of Piper Alpha still apply too: permits kept in pockets, suspended work forgotten, and a missing valve that nobody mentioned at a shift change.
The course brings contractor management and permit systems together, because on site they are the same job. It reads ISO 45001:2018 clause 8.1.4.2 and its guidance in plain words, then follows the five practical steps in the UK Health and Safety Executive's guide HSG159, from planning the job to reviewing it, and the permit system advice in HSG250, including its suggested titles for roles, its thirteen essential elements of a permit form and its case studies. One built company runs through all ten modules: a fuel storage terminal in Singapore, where an isolation on the wrong valve led to a diesel release, followed by a tank shutdown with cleaning, hot work and scaffolding contractors working at once. No country's permit, construction or electrical law is taught as a requirement, so the course suits learners in any market.
The course is written for site, plant and facility managers who answer for everyone working at their sites, and for the maintenance and engineering supervisors who plan contractor jobs. It suits permit issuers, area authorities and isolating authorities, who control high-risk work day to day, and contractors' managers and supervisors, who accept permits and run crews under them. Procurement staff who choose contractors will see why safety evidence belongs in the decision, and internal auditors will find the questions to ask about a permit system. Examples come from fuel terminals, chemical plants, construction sites, hospitals, offices, hotels, shopping centres and data centres.
After the course, you can plan a contractor job, choose contractors on evidence of experience, competence and supervision, and induct and brief them so that nobody starts work unannounced. You can judge which jobs need a permit to work and which do not, name the roles in a permit system and keep issue separate from acceptance. You can check that a permit is specific, linked to related permits and isolation certificates, signed with dates and times, and displayed at the job, and you can control suspension, shift handover and hand-back. You can also monitor permits at the job and audit a permit system. Short practice questions follow each module, and a scenario-based exam leads to a Sterling Academy Certificate of Completion. The certificate records training; only an employer can authorise a person to issue or accept permits.
Module 1, Why contractor control matters: shows why contractor control and permits to work matter through four cases, from a roof fire during hot work to the Piper Alpha handover. Module 2, What ISO 45001 requires: reads what ISO 45001 requires for contractors and procurement in plain words, with its guidance and the ILO guidelines. Module 3, Planning and choosing: covers planning a contractor job and choosing the contractor, using the first two of HSE's five steps for managing contractors. Module 4, Contractors on site: shows how to manage contractors on site: signing in, a named contact, the briefing, checking the job, keeping a check and reviewing it. Module 5, What a permit to work is: explains what a permit to work system is, what it is for, which jobs need one, and how it fits with task risk assessment. Module 6, Roles in a permit system: sets out the roles in a permit to work system, what each person is responsible for, and the training and supervision they need. Module 7, The permit and its issue: explains what a permit form should contain, its design and colours, electronic permits, and the planning that comes before issue. Module 8, Permits in use: covers keeping a permit working once it is issued: display, suspension, interaction between jobs, shift handover and hand-back. Module 9, Monitoring and audit: shows how to monitor, audit and review a permit to work system so that it works at the job, not only on paper. Module 10, Putting it together: puts contractor control and permits to work together on a full tank job, then applies them on a construction site and in facilities.
Frequently asked questions
About Contractor Safety and Permit to Work Training, its certificate and enrolment.
Ask SterlingYes. Sterling Academy's ISO 45001 courses are built by the Sterling consulting group, which has taken organisations to certification across 8,100+ client engagements in 60+ countries over 20+ years. They cover the awareness, implementation, internal auditor and specialist levels, always on the current edition, with practice questions that show the right answer. Each course ends with a final exam and a verifiable certificate that anyone can check online, plus a LinkedIn badge, and client administrators can show an auditor exactly who has been trained. You will understand what ISO 45001 asks of you, contribute to your organisation's implementation and audit readiness, and play your part with confidence when the auditor visits. Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.
Awareness: ISO 45001:2018 Awareness Training · Implementation: ISO 45001:2018 Implementation Training · Internal auditor: ISO 45001:2018 Internal Auditor Training · Specialist: Hazard Identification and Risk Assessment (HIRA) Training
It is for site, plant and facility managers, maintenance and engineering supervisors, permit issuers and area authorities, contractor managers and supervisors, and the procurement staff who appoint contractors. It also suits health and safety officers and internal auditors who check contractor control and permit systems against ISO 45001.
The course follows ISO 45001:2018 clause 8.1.4.2 on contractors, with the clauses on shared workplaces and the hierarchy of controls. It teaches permit systems from the UK Health and Safety Executive's guide HSG250 and contractor management from its guide HSG159, both published online by HSE. It does not teach any country's law as a requirement.
Short practice questions after each module help you check your understanding; they do not count toward the result. The course ends with a scenario-based multiple-choice final exam. Learners who score 60% or more receive a Sterling Academy Certificate of Completion, and one retake is included. Each certificate carries a unique number and a QR code for online checking.
No. Only your employer can authorise you to issue or accept permits, after training on its own permit system and an assessment of your competence at that site. This course gives you the principles that apply across permit systems, so that site training is easier to follow. The certificate is a training certificate and not an authorisation.
The course is in preparation. Register on this page with “Notify me when it opens” and we will send you one e-mail when it opens for enrolment, with the price per learner and the details for team enrolment. The course page will then show the full module list and the video runtime.
Sources
Your certificate
You will understand what ISO 45001 asks of you, contribute to your organisation's implementation and audit readiness, and play your part with confidence when the auditor visits. Your certificate can be verified online in seconds, so certification body auditors, employers and clients can confirm your training instantly.
Complete the course and its final exam and you receive a Sterling Academy Certificate of Completion, verifiable online by QR code, with a LinkedIn badge to share.
Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.
Ask about course requirementsYour next step
Not sure which course?