← All courses

Practitioner training · Medical device quality

FDA QMSR Training: 21 CFR Part 820 and ISO 13485 Since February 2026

Part of the ISO 13485:2016 learning path → Step 2

FDA QMSR training for the quality or regulatory manager whose device company sells in the United States and now works under a regulation that changed on 2 February 2026. You may have been told to map the quality system from the old Quality System Regulation to the QMSR, to retire the DMR and DHF language, to get management review and internal audit records ready for FDA to read, or to brief the team on how inspections work now that QSIT has gone.

This course shows you exactly what Part 820 now requires: ISO 13485:2016 incorporated by reference, the FDA-specific requirements that sit alongside it, and the inspection approach under Compliance Program 7382.850. You follow an infusion pump maker in Boston through a full gap assessment, so you leave with a method and an action plan you can apply to your own organisation.

FDA QMSR training explains the Quality Management System Regulation, 21 CFR Part 820 as amended and in force since 2 February 2026. It covers how Part 820 incorporates ISO 13485:2016 by reference, the FDA-specific requirements for records, complaints, labelling, reporting and traceability, how FDA now inspects, and how to move an existing QMS across.

Training a team? Get a quote for your organisation

Part of: Medical Device Quality and Risk Management Training

Part of: GMP & Medical Devices

Secure payment by Stripe · for yourself or for your team

What you get

  • 14 video modules

    About 3½ hours, with captions. Watch at your own pace on any device.

  • Practice after every module

    Short questions check your understanding before you move on.

  • Final exam

    Multiple choice, with immediate retakes if you need them.

  • Built by experts

    Industry experts, domain specialist trainers and globally renowned auditors with 30+ years in ISO and GRC.

A certificate you can prove, and share

Verifiable certificate with a QR code anyone can scan, plus a digital badge to add to your LinkedIn profile.

See how verification works →

Standard and edition21 CFR Part 820, Quality Management System Regulation (2026)

Last updated31 October 2026

Why the QMSR matters now: the first warning letters are out

The transition period is over. At an FDA town hall in April 2026, the agency said companies need to be compliant with the QMSR now, and the first warning letters under the new rule cite ISO 13485:2016 clauses directly.

In May 2026, FDA issued a warning letter to Linemaster Switch Corporation, a maker of foot pedal controls used with medical lasers, after an inspection that started two days after the QMSR took effect. It cited rework that was not documented, a risk management procedure that did not include post-market feedback, and a supplier corrective action closed with no root cause and no corrective action recorded. In July 2026, a warning letter to Koven Technologies cited a Doppler device whose indication was widened to fetal use without design change control or a risk analysis of fetal risks.

Infusion pumps show what is at stake. In July 2025, FDA issued an early alert about a correction to Baxter's Novum IQ large-volume pumps for underinfusion and misloading; as of 27 June 2025, 79 serious injuries and two deaths had been reported, and the recall was classed as Class I in December 2025. The course uses these cases as questions for your own system: would your records, your risk file and your change control stand up the same way?

Who this FDA QMSR training course is for

The course is for people responsible for a medical device quality system that must meet FDA requirements.

You need it if you are running the move from the former Quality System Regulation, preparing for your first FDA inspection under Compliance Program 7382.850, responding to a 483 observation, or are certified to ISO 13485 and need to know what FDA adds on top.

  • Quality and regulatory affairs managers of device companies selling in the United States
  • QMS leads moving procedures and records from the former QSR to the QMSR
  • Contract manufacturers and specification developers
  • Internal auditors of device quality systems
  • Importers and overseas manufacturers preparing for FDA inspection

What you will learn

By the end you will know where every requirement comes from, which documents FDA will ask for and what your gap assessment must cover.

  • Explain the QMSR, its scope and how it incorporates ISO 13485:2016 by reference
  • Identify the FDA-specific requirements that apply alongside ISO 13485
  • Map your existing QMS from the former Quality System Regulation to the QMSR
  • Apply risk management across the QMS and the product life cycle
  • Prepare records, complaint files and design documentation for FDA inspection
  • Build a gap assessment and action plan for your own organisation

Course outline: 14 modules

The course follows the order of the regulation and of ISO 13485, then closes with inspections and your action plan.

  • Module 1, Welcome, why the QMSR matters: three recent cases, what changed in 2026, XYZ Medical and the scope of the course.
  • Module 2, From QSR to QMSR, why and who: why FDA amended Part 820, the dates, who the rule covers and who it does not.
  • Module 3, Incorporation by reference: what Part 820 incorporates, FDA's definitions, where the law controls and what happens to older records.
  • Module 4, Management responsibility and the QMS: top management's duties, reviews FDA can now read, and a culture of quality.
  • Module 5, Risk management across the QMS: two levels of risk work, the feedback loop and one hazard followed through the system.
  • Module 6, Resources, competence and infrastructure: training effectiveness, infrastructure, work environment and measuring equipment.
  • Module 7, Design and development controls: who must apply them, from design plan to design and development file, changes and inspection.
  • Module 8, Purchasing and supplier controls: outsourced processes, supplier evaluation, purchasing information, verification and FDA's view.
  • Module 9, Production, validation and traceability: production controls, process and software validation, sterile devices, UDI and traceability.
  • Module 10, Records, complaints and labelling: FDA's additions for complaint, servicing and UDI records, and labelling and packaging controls.
  • Module 11, Feedback, complaints and reporting: medical device reporting, corrections and removals, advisory notices and their records.
  • Module 12, CAPA, audits and nonconforming product: rework, data analysis, corrective and preventive action, internal audits and management review.
  • Module 13, How FDA inspects under the QMSR: Compliance Program 7382.850, six QMS areas, two models, the visit, outcomes and preparation.
  • Module 14, Your gap assessment and action plan: a worked gap assessment, the action plan, a road map, a checklist and the final exam.

The QMSR explained: what 21 CFR Part 820 requires now

The Quality Management System Regulation is the amended 21 CFR Part 820. FDA published the final rule on 2 February 2024 and it took effect on 2 February 2026, replacing the Quality System Regulation that had been in effect since 1997. It applies to manufacturers of finished devices intended for human use that are sold in the United States, with the existing exemptions still in place.

Instead of writing its own text, Part 820 now incorporates ISO 13485:2016 and clause 3 of ISO 9000:2015 by reference. On top sit FDA-specific requirements: definitions in section 820.3 that control where they differ from the ISO terms, the requirement in 820.10 to meet other FDA rules such as medical device reporting (Part 803), corrections and removals (Part 806) and unique device identification (Part 830), the records requirements of 820.35, including complaint and servicing records, and the labelling and packaging controls of 820.45. Terms such as device master record and design history file give way to the medical device file and the design and development file.

Inspections changed too. FDA retired the QSIT approach on 2 February 2026 and now inspects under Compliance Program 7382.850, and records such as management reviews and internal audit reports are no longer exempt from FDA review. FDA also said that ISO 13485 certificates are not accepted in place of inspection.

How the course works

The course is 14 on-demand video modules, about 3 hours of video in total. Each module shows the requirement with its source, applies it at XYZ Medical with a filled-in document and shows the evidence it produces. Practice questions follow every module, and four modules add a practice exercise with a model answer: one hazard followed through the quality system, supplier classification and controls, a reportability decision with a field correction, and a corrective action record for nonconforming pumps.

At the end you take a scenario-based multiple-choice final exam drawn from the course's question bank. Score 60% or more and you receive a Sterling Academy Certificate of Competence; one retake is included. You study online, on any device, at your own pace.

What you can do after the course

The course ends with your own gap assessment, so the practical work starts immediately.

  • Run a QSR-to-QMSR gap assessment and turn it into a dated action plan with owners
  • Update procedures and document structures to ISO 13485 terms while keeping the FDA-specific records
  • Check that complaint files, MDR decisions and correction and removal records meet Parts 803, 806 and 820.35
  • Link risk management to post-market feedback, design changes and CAPA, as recent warning letters expect
  • Prepare management review, internal audit and supplier records that FDA may now read
  • Brief your team on how an inspection under Compliance Program 7382.850 runs

For teams and organisations

A QMSR transition touches design, production, purchasing, complaints and regulatory staff. A company plan lets a client administrator add learners, assign courses and follow progress reports, so you can show who has been trained before the inspection. One invoice covers all learners.

Get a quote for your organisation and tell us how many people you want to train.

Why Sterling Academy

Sterling Academy courses are built by industry experts, domain specialist trainers and globally renowned auditors with 30+ years in ISO and GRC. The Academy is the training arm of Sterling International Consulting, with 8,100+ client engagements in 60+ countries over 20+ years.

Every course teaches the current edition. This one teaches Part 820 as in force in October 2026, with ISO 13485:2016, the 2026 Compliance Program and FDA's own town hall answers. It is a training course, not an FDA programme, and compliance is shown by your own quality system.

Preview this course

Experience the learning
before you enrol.

Watch a sample from US FDA QMSR (21 CFR Part 820) Training before you enrol.

US FDA QMSR (21 CFR Part 820) TrainingSample

Inside the course

A clear path through the essentials.

14 modules, 14 practice checkpoints, 4 practice exercises and a final exam. Video runtimes are approximate; allow additional time for the practice questions and the final exam. Modules marked optional can be skipped; the others are studied in any order.

Part 1The foundations, and why FDA moved to the QMSRApprox. 28 min

  1. Welcome: why the QMSR matters13 min

    Why the FDA Quality Management System Regulation (QMSR, 21 CFR Part 820) matters since 2 February 2026: recent device cases and the course.

    What this module covers

    Opens with a self-check: how well do you know US device quality rules, what changed on 2 February 2026, and what would an FDA investigator ask to see first? Then recent cases: the July 2025 early alert on Baxter's Novum IQ large-volume infusion pump, which could underinfuse after a large rate increase and was corrected in place, and one of the first warning letters under the QMSR, dated May 2026, citing ISO 13485 clauses directly. Draws lessons on complaints and risk, changes, procedures and reporting. Explains that Part 820 now builds in ISO 13485:2016 with FDA's own additions, and the law controls where they conflict. Introduces XYZ Medical Inc. in Boston, an infusion pump maker with about 350 staff, a board supplier in Toronto and a contract steriliser in Chicago. Outlines the fourteen modules and exam, and closes with a recap.

    What you will be able to do

    • Explain what changed for US device makers on 2 February 2026
    • Describe how the QMSR builds on ISO 13485:2016
    • Recognise the lessons recent FDA device cases hold for your site

    Why it matters

    FDA now measures your quality system against a new regulation; knowing what changed tells you where to look first.

    Practice: Practice: Welcome: why the QMSR matters · 3 questions

  2. From QSR to QMSR: why and who14 min

    From the FDA Quality System Regulation (QSR) to the QMSR: why FDA harmonised Part 820 with ISO 13485, the effective date, and who it applies to.

    What this module covers

    Starts with XYZ Medical before the change, running one set of procedures for the QSR and a second layer for its ISO 13485 certificate, with two vocabularies for the same work, which FDA itself called inefficient. Walks through five dates, from the first device GMP rule in 1978 under section 520(f) of the FD&C Act to the QSR in effect from 1 June 1997, the final QMSR rule published in February 2024 and its effect on 2 February 2026. Explains FDA's reasons: harmonise with ISO 13485, modernise, cut duplicated effort and make risk management explicit. Covers who the rule covers, including specification developers and contract sterilisers, with a New York catheter start-up and a Los Angeles contract maker, and who it does not. Shows XYZ Medical's scope map of every operation and who controls it, and closes with a recap.

    What you will be able to do

    • Explain why FDA replaced the QSR with the QMSR
    • Identify which operations and companies Part 820 applies to
    • Build a scope map showing each operation and how it is controlled

    Why it matters

    Knowing exactly what you do tells you which parts of the rule apply, including to suppliers and sterilisers you use.

    Practice: Practice: From QSR to QMSR: why and who · 3 questions

Part 2The quality system, FDA's own rules and how FDA inspectsApprox. 218 min

  1. Incorporation by reference15 min

    Incorporation by reference in the QMSR: section 820.7, ISO 13485:2016 and ISO 9000:2015 definitions, where FDA law controls, and old record terms.

    What this module covers

    Opens with a new quality engineer at XYZ Medical asking where the device master record is: withdrawn and ownerless in one answer, moved to the medical device file under clause 4.2.3 of ISO 13485 in the other. Reads section 820.7, which incorporates ISO 13485:2016 for sections 820.1, 820.3, 820.10, 820.35 and 820.45, and clause 3 of ISO 9000:2015 for definitions. Explains what incorporation by reference means, why FDA's definitions win where they differ, and how the FD&C Act controls in any conflict, with a Chicago dental implant maker reading implant with FDA's meaning. Shows XYZ Medical's term map, one medical device file per product family, recording why a requirement does not apply, and its quality manual naming both texts. Covers a Sydney bed maker's old records and closes with a recap: ISO's words, read with FDA's meanings.

    What you will be able to do

    • Explain what incorporation by reference means in Part 820
    • Map old QSR record terms to their new homes under ISO 13485
    • Apply FDA's definitions where they differ from ISO's

    Why it matters

    The terms changed but the content still has to exist; mapping old records avoids gaps FDA can still ask about.

    Practice: Practice: Incorporation by reference · 3 questions

  2. Management responsibility and the QMS14 min

    QMSR management responsibility: clause 4.1, top management duties in clause 5, quality culture, objectives and management review records.

    What this module covers

    Starts with two management reviews at XYZ Medical on the same rising complaints about the pump's occlusion alarm: one noted and forgotten, the other approving a design change with a budget, owner and date. Explains that under the QMSR, management review reports are no longer exempt from FDA inspection. Covers clause 4.1: documenting the system and roles, a risk-based approach to process control, outsourcing and validating quality system software. Then clause 5 and top management's six duties, the management representative role held by XYZ's Director of Quality, and the culture of quality FDA expects. Shows XYZ Medical's quality objectives for the year and part of its review record, including a revised supplier procedure due in April, and a Los Angeles catheter contract maker feeding customer complaints into its own review. Closes with a recap: a review is worth the decisions it makes.

    What you will be able to do

    • Explain what clause 4.1 and clause 5 ask of top management
    • Write management review records that show decisions and resources
    • Set quality objectives that management can act on

    Why it matters

    FDA can now read your management review; one that records decisions shows a culture of quality.

    Practice: Practice: Management responsibility and the QMS · 3 questions

  3. Risk management across the QMS14 min

    Risk management across the QMSR quality system: ISO 13485 clauses 4.1.2 and 7.1, feedback into risk files, and how FDA inspects risk.

    What this module covers

    Opens with the May 2026 warning letter to a foot pedal control maker whose risk procedure did not say how risk work was done, who approved it, when documents were updated, or how complaints fed in. Contrasts it with XYZ Medical, where an occlusion alarm complaint reaches the risk file within days. Explains the two separate requirements: a risk-based approach to controlling quality system processes in clause 4.1.2 b), and documented risk management processes for product realisation in clause 7.1, and how FDA reads them. Follows one hazard through XYZ's quality system, with a mandatory change request field naming affected risk file entries and two complaints in one week. Looks at side-rail entrapment at a Sydney bed maker and a wrong result at a New York diagnostic software start-up. Ends with a practice exercise, what investigators review, and a recap.

    What you will be able to do

    • Tell the two levels of risk management in ISO 13485 apart
    • Set triggers that update risk files from complaints and changes
    • Explain what FDA investigators look for in risk files

    Why it matters

    FDA inspections now start from your risk documents; a risk process that keeps running is what they expect to see.

    Practice: Practice: Risk management across the QMS · 3 questions

  4. Practice exercise: One hazard through the quality systemabout 15 min
  5. Resources, competence and infrastructure14 min

    QMSR resources, staff competence and training effectiveness, infrastructure and maintenance, work environment and control of measuring equipment.

    What this module covers

    Begins on XYZ Medical's final test line, where one tester signed a training record but misread a new acceptance limit for a week, while a supervisor's practical check caught the same error for another. Covers clauses 6.1 and 6.2 on resources and competence, and FDA's April 2026 view that training effectiveness is checked in proportion to the risk of the work. Shows XYZ's competence matrix, final testers at the high-risk end, and the patient story every new assembler hears. Explains infrastructure and maintenance, including test benches, cleanroom air handling and the complaint database, and clause 6.4.1 cited in the May 2026 letter. Covers the controlled room for administration sets, robot welding in Sydney and a Los Angeles cleanroom. Ends with clause 7.6 on measuring equipment, XYZ tracing 212 pumps tested since the last good check, and a recap.

    What you will be able to do

    • Check training effectiveness in proportion to the risk of the work
    • Identify infrastructure and work environment that need control
    • Reassess earlier results when measuring equipment fails calibration

    Why it matters

    A signed training record does not show competence; checking that training worked stops errors before release.

    Practice: Practice: Resources, competence and infrastructure · 3 questions

  6. Design and development controls14 min

    QMSR design controls under ISO 13485 clause 7.3 and section 820.10(c): who must apply them, design inputs, reviews, changes and the design file.

    What this module covers

    Opens with the July 2026 warning letter to a Doppler device maker that added fetal heart sounds as a use in its manual with no design change records, validation, review or 510(k) evaluation. Contrasts it with XYZ Medical raising a design change, updating the risk file and planning validation to add a new patient group. Reads section 820.10(c): clause 7.3 applies to class two and three devices, class one devices automated with software and five listed class one types, such as gloves made by a maker in Mumbai. Walks through clause 7.3 from planning and inputs to outputs, review, verification, validation, transfer and changes, with XYZ's weekly change board. Shows the index of the design file for XYZ's second-generation pump, which replaces the former design history file, and how FDA inspects design. Closes with a recap: a new intended use is a design change.

    What you will be able to do

    • Decide whether a device must follow design controls under 820.10(c)
    • Explain the steps of ISO 13485 clause 7.3 from planning to changes
    • Treat labelling and intended use changes as design changes

    Why it matters

    A change to a manual can be a design change; seeing how far design controls reach avoids a warning letter.

    Practice: Practice: Design and development controls · 3 questions

  7. Purchasing and supplier controls15 min

    QMSR purchasing and supplier controls: outsourced processes, risk-based supplier evaluation, quality agreements, change notification and incoming checks.

    What this module covers

    Starts with XYZ Medical's circuit board supplier in Toronto switching to a cheaper capacitor without notice, which caused field alarm faults, against a purchase agreement requiring notice before any change. Covers outsourced processes as the organisation's responsibility under clause 1 of ISO 13485, and written quality agreements under clause 4.1.5. Explains supplier selection, monitoring and re-evaluation proportionate to the device's risk, with lighter incoming checks for good suppliers and audit findings followed up. Shows part of XYZ's approved supplier list and what it puts in a quality agreement. Covers FDA's April 2026 note on outsourced design and manufacture, a New York specification developer using a Los Angeles contract maker, and a Sydney bed maker relying on a supplier's certificate, which FDA has said may not be enough. Ends with a practice exercise classifying suppliers by risk and a recap.

    What you will be able to do

    • Set supplier controls proportionate to the device's risk
    • Write a quality agreement that requires notice of changes
    • Explain why a supplier's ISO 13485 certificate may not be enough

    Why it matters

    Your supplier's change is your device's change; one sentence in a purchase agreement can stop a field problem.

    Practice: Practice: Purchasing and supplier controls · 3 questions

  8. Practice exercise: Classify suppliers and set their controlsabout 12 min
  9. Production, validation and traceability15 min

    QMSR production controls, process and software validation, sterile barrier sealing, unique device identification (UDI) and device traceability.

    What this module covers

    Opens with XYZ Medical's pouch sealer for sterile administration sets: drifting unnoticed in one version, validated and monitored on every cycle in the other, with affected packs located within a day through the UDI. Covers clause 7.5.1 on planned, monitored and controlled production with a verified record for each device or batch. Explains validation of processes that cannot be fully verified, such as XYZ's pouch sealing and tubing bonds, sterilisation at a contract steriliser whose reports sit in XYZ's files, and production software validated in proportion to risk. Then identification, with serial numbers and lot numbers in the UDI, screened repair reports, and FDA's additions: UDI under Part 830, tracking under Part 821 and traceability for life-supporting devices, such as home ventilators made in Singapore. Shows the batch record for one lot of sets and a Los Angeles tip-bonding validation, and closes with a recap.

    What you will be able to do

    • Identify processes that must be validated because they cannot be fully tested
    • Check that each batch record carries its unique device identifier
    • Explain FDA's additions for UDI, tracking and implant traceability

    Why it matters

    If a batch proves faulty, validated processes and traceable records let you find every affected unit within a day.

    Practice: Practice: Production, validation and traceability · 3 questions

  10. Records, complaints and labelling15 min

    QMSR section 820.35 complaint and servicing records with UDIs, and section 820.45 labelling and packaging controls, inspection and release.

    What this module covers

    Begins with a complaint file at XYZ Medical about an occlusion alarm that sounded late: a good investigation, but no UDI and no record of what the hospital was told, against a second file with all the items section 820.35(a) lists. Explains the baseline in clause 4.2.5 of ISO 13485 on control of records, then FDA's additions in section 820.35: specific content for complaint and servicing records, UDIs for each device or batch, and confidential marking. Shows how a repeat report can refer to the first investigation with a recorded reason, XYZ's updated complaint record and its servicing records for pumps repaired in hospitals. Covers section 820.45 on labelling and packaging procedures, accuracy checks, documented release and inspection to prevent mix-ups, with XYZ's label check for one lot. Notes that a Chicago maker exempt from good manufacturing practice still keeps complaint files, and closes with a recap.

    What you will be able to do

    • Check that a complaint record holds every item section 820.35 lists
    • Apply section 820.45 labelling and packaging checks before release
    • Explain which record rules apply even to exempt devices

    Why it matters

    A good investigation can still fail inspection if the record is incomplete; complete records and correct labels avoid that.

    Practice: Practice: Records, complaints and labelling · 3 questions

  11. Feedback, complaints and reporting15 min

    Device feedback, complaint handling and FDA reporting: medical device reports (MDR) under Part 803, corrections and removals under Part 806, advisory notices.

    What this module covers

    Opens with two field actions: the June 2021 Philips Respironics recall of sleep apnea machines and ventilators, followed by an April 2024 consent decree that included allegations of unreported corrections or removals, and Baxter's July 2025 correction of its Novum IQ pumps in place. Covers clause 8.2.1 on a documented feedback process and how Part 820 plugs in FDA's reporting rules. Explains that the reporting clock starts when any employee becomes aware of a reportable event, and the Part 803 deadlines of thirty calendar days and five work days. Shows XYZ Medical's reportability record for the late alarm complaint, then a software fix to every pump in the field under Part 806 and its ten working day report. Looks at a side-rail latch in Sydney and a Tokyo scanner importer's duties. Ends with a practice exercise, MDR event files and a recap.

    What you will be able to do

    • Decide whether a complaint is a reportable medical device event
    • Apply the Part 803 and Part 806 reporting deadlines
    • Record the reasons behind a decision not to report

    Why it matters

    The clock starts at awareness, not when the investigation ends; knowing the deadlines keeps reports on time.

    Practice: Practice: Feedback, complaints and reporting · 3 questions

  12. Practice exercise: A reportability decision and a field correctionabout 15 min
  13. CAPA, audits and nonconforming product15 min

    QMSR nonconforming product and rework, data analysis, CAPA under ISO 13485 clauses 8.5.2 and 8.5.3, and internal audits covering the whole of Part 820.

    What this module covers

    Returns to the May 2026 warning letter, where a customer's corrective action request for six failed foot pedals came back with the root cause blank, citing clause 8.5.2, and rework lacked documentation, citing clause 8.3.4. Explains the difference between a correction and corrective action. Covers clause 8.3.1 on identifying, segregating, evaluating and disposing of nonconforming product, concessions such as a pump housing with a cosmetic mark, and rework to approved procedures. Shows XYZ Medical trending complaint, service and test data together, and its corrective action record for the late alarm. Explains corrective and preventive action reviewed for effectiveness, and internal audits where nobody audits their own work, covering sections 820.35 and 820.45 and the reporting rules. Adds a Los Angeles contract maker's customer requests, a practice exercise and a recap: close the loop, and show it closed.

    What you will be able to do

    • Tell a correction from a corrective action
    • Write a CAPA record from root cause to effectiveness check
    • Plan internal audits that cover the full QMSR, not only ISO 13485

    Why it matters

    When a problem comes back, the system that chose the fix usually failed; a closed loop stops repeat findings.

    Practice: Practice: CAPA, audits and nonconforming product · 3 questions

  14. Practice exercise: Nonconforming pumps and a corrective action recordabout 15 min
  15. How FDA inspects under the QMSR14 min

    How FDA inspects medical device makers under the QMSR: compliance programme 7382.850 replacing QSIT, six areas, Model 1 and Model 2, outcomes.

    What this module covers

    Opens with day one of an FDA inspection at XYZ Medical: no host and scattered risk files in one version, a trained host, a back room team and ready risk files in the other. Explains that from 2 February 2026 FDA stopped using QSIT and follows the risk-based process in compliance programme 7382.850, starting from patient risk. Covers the six quality system areas and the four other FDA requirements, including medical device reports and reports of corrections and removals, and the two inspection models, with a Los Angeles maker awaiting a pre-approval inspection and a Chicago contract maker expecting Model 1. Explains the three outcomes, No, Voluntary or Official Action Indicated, and audits under the Medical Device Single Audit Program. Shows XYZ's readiness plan and a question from the investigator to test your trail, and closes with a recap: FDA starts from risk.

    What you will be able to do

    • Explain how FDA's risk-based inspection process replaced QSIT
    • Describe the six areas and two models of a QMSR inspection
    • Prepare hosts, a back room and records for an FDA inspection

    Why it matters

    Preparation does not change your quality system, it shows it well; knowing how FDA inspects helps you answer with evidence.

    Practice: Practice: How FDA inspects under the QMSR · 3 questions

Part 3Your gap assessment and action planApprox. 14 min

  1. Your gap assessment and action plan14 min

    A QMSR gap assessment and transition action plan: a six-step method, a worked case at XYZ Medical, a road map, a checklist and the final exam.

    What this module covers

    Starts with FDA's April 2026 statement that records made before 2 February 2026 need not be recreated, but processes needing change should be identified and planned, with its example of feedback never fed into risk management. Sets out a six-step method: scope your roles, sites and devices, map every requirement in ISO 13485, Part 820 and Parts 803, 806, 821 and 830, compare with real records, rate the gaps, act and verify. Shows what XYZ Medical records on each line of its gap register, then runs the method from start to finish, with XYZ's own rating rule and how it closed a gap. Covers four mistakes to avoid, starting your own first line, and a Sydney bed maker with forty staff. Ends with the road map, a checklist, the takeaways and the final exam of scenario-based questions.

    What you will be able to do

    • Run a six-step QMSR gap assessment against real records
    • Rate gaps by risk and give every action an owner and a date
    • Verify the transition with an audit and a mock inspection

    Why it matters

    A gap register and verified action plan are what you hand FDA to show your transition; find your gaps before FDA does.

    Practice: Practice: Your gap assessment and action plan · 3 questions

Frequently asked questions

Your questions,
answered.

About US FDA QMSR (21 CFR Part 820) Training, its certificate and enrolment.

Ask Sterling
Is Sterling Academy a good choice for US FDA QMSR training?

Yes. Sterling Academy's US FDA QMSR training is built by the Sterling consulting group, which has taken organisations to certification across 8,100+ client engagements in 60+ countries over 20+ years. It is always on the current edition, with practice questions that show the right answer. Each course ends with a final exam and a verifiable certificate that anyone can check online, plus a LinkedIn badge, and client administrators can show an auditor exactly who has been trained. You will be able to apply US FDA QMSR (21 CFR Part 820) at work and show your competence with confidence. Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.

What is FDA QMSR training?

FDA QMSR training explains the Quality Management System Regulation, 21 CFR Part 820 as amended, in force since 2 February 2026. It covers the incorporation of ISO 13485:2016 by reference, the FDA-specific requirements, what changed from the former Quality System Regulation and how FDA now inspects device manufacturers.

When did the QMSR take effect?

The QMSR took effect on 2 February 2026. FDA published the final rule on 2 February 2024, giving manufacturers two years to transition. FDA said in April 2026 that the transition period has ended and that companies need to be compliant now.

What is the difference between the QSR and the QMSR?

The QSR had its own text; the QMSR incorporates ISO 13485:2016 by reference and adds FDA-specific requirements. Terms such as device master record and design history file give way to ISO 13485 terms, management review and audit records can be reviewed by FDA, and QSIT has been replaced by a new compliance programme.

Who needs FDA QMSR training?

Quality and regulatory affairs managers, QMS leads, internal auditors, contract manufacturers and specification developers of devices sold in the United States need it. It also helps overseas manufacturers and importers who face FDA inspection and want to know what FDA adds to ISO 13485.

How long does the FDA QMSR course take?

The course has about 3 hours of video across 14 modules. Allow additional time for the practice questions, the four practice exercises and the final exam. You can complete it in one sitting or over several sessions, and return to any module when an inspection or audit is approaching.

Do I have to rewrite records created before 2 February 2026?

No. At its April 2026 town hall, FDA said records created before 2 February 2026 need not be revised or recreated, but any gaps against the QMSR must be addressed with a plan. Module 3 and Module 14 explain how to handle older records in your transition.

Do I get a certificate?

Yes. Score 60% or more in the scenario-based multiple-choice final exam, drawn from the course's question bank, and you receive a Sterling Academy Certificate of Competence. One retake is included. It is a training certificate, not an FDA qualification; compliance is shown by your own quality system.

How much does FDA QMSR training cost?

The course costs US$99 per learner, with online access on any device. Companies that want to train quality, regulatory, design and production staff together can ask for a quote for a company plan with a client administrator, progress reports and one invoice.

Can my team take the course together?

Yes. With a company plan, a client administrator adds learners, assigns the course and follows their progress through reports, which helps you show training records during an inspection. Get a quote for your organisation and tell us how many people you want to train.

Your certificate

Prove what you learned.
Share it with confidence.

You will be able to apply US FDA QMSR (21 CFR Part 820) at work and show your competence with confidence. Your certificate can be verified online in seconds, so certification body auditors, employers and clients can confirm your training instantly.

Complete the course and its final exam and you receive a Sterling Academy Certificate of Completion, verifiable online by QR code, with a LinkedIn badge to share.

Pass mark
70%
Prerequisites
None

Sterling Academy courses carry the same content as Sterling's classroom training, whose certificates are trusted and accepted by all major certification bodies, as evidence of training at client audits for over 20 years.

Ask about course requirements

Your next step

Get consulting from Sterling

Expert and experienced consultants, 8,100+ client engagements in 60+ countries, from gap assessment to a system ready for its certification audit.

Talk to a Sterling consultant

Not sure which course?

Plan your next step
in learning.

Discuss your learning needs